• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 05:43来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 27-62-41
 ALL  ú ú 01 Page 404 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 GROUND SPOILER CONTROL VALVE - ADJUSTMENT/TEST
______________________________________________
 1.  General_______
 A.  There is one task in this procedure, a functional test of the ground spoiler control valve.
 TASK 27-62-41-725-001
 2.  Ground Spoiler Control Valve Functional Test____________________________________________
 A.  References
 (1)  
12-12-00/301, Hydraulic Reservoir

 (2)  
24-22-00/201, Manual Control

 (3)  
27-62-00/201, Speed Brake Control System

 B.  
Access

 (1)  
Location Zone
 101, 102 Control Cabin
 216, 217 Main Wheel Well


 C.  
Procedure


 S 865-002
 (1)  
Supply the electrical power (Ref 24-22-00/201).

 S 865-003

 (2)  
Supply the system A hydraulic power (Ref 27-62-00/201).

 S 215-004

 (3)  
Examine the hydraulic connections on the ground spoiler control valve for leakage.

 S 875-005

 (4)  
Move the speed brake lever through more than one full cycle to bleed the hydraulic system.

 S 725-006

 (5)  
Do the test of the ground spoiler control valve:

 (a)  
Make sure the speed brake lever is in the DOWN position.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-41
 ALL  ú ú 01 Page 501 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (b) (c) (d) (e) (f) (g)  Move the speed brake lever aft until the ground spoilers move to the extended position.Make sure the speed brake lever is 29 |2 degrees (2.66 |0.20 inches) aft of the DOWN position.Move the speed brake lever to the UP position.Move the speed brake lever forward until the ground spoilers move to the retracted position.Make sure speed brake lever is 21 |4 degrees (1.93 |0.40 inches) aft of the DOWN position.Move the speed brake lever to the DOWN position.
 (6)  S 865-007Remove the system A hydraulic power (Ref 27-62-00/201).
 (7)  S 865-008Remove the electrical power (Ref 24-22-00/201).
 (8)  S 615-009Fill the hydraulic reservoir if it is necessary (Ref 12-12-00/301).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-41
 ALL  ú ú 01 Page 502 ú Mar 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 GROUND SPOILER INTERLOCK VALVE CABLE - REMOVAL/INSTALLATION
___________________________________________________________
 1.  General_______
 A.  There are two tasks in this procedure. There is a task for the removal and a task for the installation of the interlock valve cable for the ground spoilers. The interlock valve cable is installed on the right main landing gear.
 B.  To remove or install the cable, it is necessary to remove the cable from the flexible tube.
 TASK 27-62-51-004-001
 2.  Ground Spoiler Interlock Valve Cable Removal (Fig. 401)____________________________________________
 A.  References
 (1)  
27-62-00/201, Speed Brake Control System

 B.  
Access

 (1)  
Location Zone
 217 Right Main Wheel Well


 C.  
Procedure


 S 864-002
 (1)  
Make sure the hydraulic pressure in systems A and B is released (Ref 27-62-00/201).

 S 024-003

 (2)  
Remove the cable from the flexible tube:

 (a)  
Remove the bolt that attaches the lower rod end to the landing gear torsion link.

 (b)  
Remove the clamp and spacer from the protective boot.

 (c)  
Move the protective boot up until you can get access to the guide tube.


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 5(128)