(2)
AMM 24-22-00/201, Manual Control
B.
Access
(1)
Location Zone 101 Left Control Cabin - P5 forward overhead panel 102 Right Control Cabin - P6 load control center panel
C.
Procedure
S 864-010
CAUTION: MAKE SURE THAT NONE OF THE AC OR DC BUSES ARE ENERGIZED WHEN
_______ YOU REMOVE THE BPP. ELECTRICAL POWER DURING BPP REMOVAL CAN CAUSE DAMAGE TO THE BPP.
(1) Make sure that no electrical power is on the airplane (AMM 24-22-00/201).
(a)
Make sure that the GEN and APU GEN switches on the P5-4 panel are in the OFF position.
(b)
Make sure that the BAT switch on the P5-13 panel is in the OFF position.
(c)
Make sure that the external power cable is disconnected or not energized.
S 024-003
(2) Remove the BPP (black box unit with cam-lock handles) (AMM 20-10-07/201).
TASK 24-41-21-424-004
3. Bus Protection Panel Installation
_________________________________
A. Standard Tools and Equipment
(1)
External Power Supply - 115/200 volts ac, 3-phase, 400 Hz
B.
References
(1)
AMM 20-10-07/201, Electrical/Electronic Black Box
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-41-21
ALL ú ú 01 Page 401 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C.
D.
E.
A
737-300/400/500MAINTENANCE MANUAL
(2)
AMM 24-22-00/201, Manual Control
(3)
AMM 24-41-00/101, AC External Power
(4)
IPC 24-50-00, Figure 60LAccess
(1)
Location Zone 101 Left Control Cabin - P5 forward overhead panel 102 Right Control Cabin - P6 load control center panel 115 Cargo Door - P13 forward attendant's panel 202 Lower Nose Compartment - P19 external power panel 402 Right Wing - outboard leading edge
(2)
Access Panels 1101 External Power Receptacle Door 6540 Refueling Station Access Door
Procedure
S 864-011
CAUTION: MAKE SURE THAT NONE OF THE AC OR DC BUSES ARE ENERGIZED WHEN
_______ YOU INSTALL THE BPP. ELECTRICAL POWER DURING BPP INSTALLATION CAN CAUSE DAMAGE TO THE BPP.
(1) Make sure that no electrical power is on the airplane (AMM 24-22-00/201).
(a)
Make sure that the GEN and APU GEN switches on the P5-4 panel are in the OFF position.
(b)
Make sure that the BAT switch on the P5-13 panel is in the OFF position.
(c)
Make sure that the external power cable is disconnected or not energized.
S 544-006
(2)
If they are installed, remove the protective covers from the BPP and the shelf in the P6 panel.
S 424-007
(3)
Install the BPP (black box unit with cam-lock handles) (AMM 20-10-07/201).
S 864-019
(4)
Turn the DC meter switch on the P5-13 panel to BAT.
(a)
Make sure that the DC voltmeter shows 24 | 4 volts.Make Sure That the Bus Protection Panel Operates Correctly.
(1)
Make sure the access door for the refueling station is closed.
S 414-012
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-41-21
ALL ú ú 01 Page 402 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 电源 ELECTRICAL POWER(163)