• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b)  
Set the BUS TRANSFER switch to the OFF position.

 (c)  
Push the switch S2 on the M238 to the INDICATE position. 1) Make sure that the DC BUS PWR ON - NO. 1 light stays off.

 (d)  
Open these circuit breakers and attach the DO-NOT-CLOSE tags:

 1)  P6-4 AIR CONDITIONING AND AIRSTAIR CONTROL AC POWER INDICATION Panel a) C808, TR UNITS NO. 3

 (e)  
Push the switch S2 on the M238 to the INDICATE position. 1) Make sure that the DC BUS PWR ON - TR 3 light stays off.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-31
 ALL  ú ú 02 Page 405 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 2) Make sure that the DC BUS PWR ON - NO. 2 light stays off. 3) Make sure that the DC BUS PWR ON - BAT light comes on.
 S 864-012
 (8) Put the airplane back to its usual condition.
 (a) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
 1)  P6-4 AIR CONDITIONING AND AIRSTAIR CONTROL AC POWER INDICATION Panel a) C806, TR UNITS NO. 1 b) C807, TR UNITS NO. 2 c) C808, TR UNITS NO. 3
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-31
 ALL  ú ú 02 Page 406 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 MAIN POWER CIRCUIT BREAKERS - REMOVAL/INSTALLATION
__________________________________________________
 1.  General
_______
 A.  This procedure has these tasks:
 (1)  
The first task removes the main power circuit breaker (MPCB), from the P6-11 and P6-12 panels.

 (2)  
The second task installs the MPCB in the P6-11 and P6-12 panels.

 (3)  
The third task removes the MPCB from the P6-3 and P6-4 panels.

 (4)  
The fourth task installs the MPCB in the P6-3 and P6-4 panels.

 (5)  
The fifth task removes the MPCB from the right forward compartment.

 (6)  
The sixth task installs the MPCB in the right forward compartment.

 B.  
The two MPCBs for the APU generator are installed in the lower
 compartments of the P6-11 and P6-12 panels.


 C.  
The two transfer relays are located behind the P6-3 and P6-4 panels.

 D.  
The two MPCBs for the external power are installed in the right forward compartment, adjacent to the nose wheel well.

 E.  
The two MPCBs for the engine driven generators are installed in the right forward compartment.


 TASK 24-21-41-024-001
 2.  Remove the MPCB from the P6-11 and P6-12 Panels (Fig. 401)
_______________________________________________
 A.  Access
 (1)  
Location Zones 102 Right Control Cabin - Main Power Distribution Panel P6

 B.  
Prepare for the Removal


 S 864-038
 (1)  
Remove electrical power (AMM 24-22-00/201).

 S 034-039

 (2)  
Disconnect the battery connector from the main battery, located in the electronic equipment area.

 S 014-005

 (3)  
Loosen the two screws on the front of the P6-11, and the P6-12 panels and open the panels.

 C.  
Procedure


 S 024-015
 WARNING: MAKE SURE ALL THE POWER IS OFF BEFORE YOU TOUCH A CONDUCTOR IN
_______ THE CONTROL COMPARTMENTS. ELECTRICAL SHOCKS CAN CAUSE INJURY TO PERSONS.
 (1)  Remove the MPCB:
 (a)  Remove the two screws which attach the MPCB cover plate.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-41
 ALL  ú ú 01 Page 401 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
MAIN POWER P6-3 P6-4 SEE
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 电源 ELECTRICAL POWER(113)