A 737-300/400/500MAINTENANCE MANUAL
R = REVISED, A = ADDED OR D = DELETED CHAPTER 25 F = FOLDOUT PAGE EFFECTIVE PAGES 17 PAGE 4 JUL 12/02 LAST PAGE
D6-37537
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
CHAPTER 25 - EQUIPMENT/FURNISHINGS
TABLE OF CONTENTS
_________________
Chapter Section Subject_______ Subject ____ Effectivity
_______ Page ___________
EQUIPMENT/FURNISHINGS 25-00-00
_____________________
Description and Operation 1 ALL
General 1
EQUIPMENT/FURNISHINGS 25-01-12
Cleaning/Painting 701 ALL Approved Repairs 801 ALL CABIN ACCOMODATION CONVERSIONS 25-09-10 Description and Operation 1 ALL CABIN CONVERSION ALL-PASSENGER 25-09-51 Maintenance Practices 201 ALL
FLIGHT COMPARTMENT 25-10-00
__________________
Description and Operation 1 ALL
General 1
Covering - Floor 6
Equipment - Miscellaneous 6
Lightshield 1
Lining and Insulation 6
Panels - Electronic Control 1
Panels - Instrument 1
Provisions - Stowage 1
Seat - First Observer's 6
Seats - Captain's and First 6
Officer's EQUIPMENT - FLIGHT COMPARTMENT 25-11-11 Maintenance Practices 201 ALL Inspection/Check 211 Seat Adjustment View Guide 211
Removal/Installation 201 Crew Seat 201 Lightshield 207 Seat Adjustment View Guide 209
25-CONTENTS
BEJ Page 1 Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
CHAPTER 25 - EQUIPMENT/FURNISHINGS
TABLE OF CONTENTS
_________________
Subject
_______
LINING AND INSULATION Maintenance Practices Approved Repairs -Insulation
Removal/Installation - Crash Padding Removal/Installation - Drip Pan Removal/Installation -Insulations Removal/Installation -Lining SEAT TRACKS - FLIGHT COMPARTMENT Inspection/Check
PASSENGER COMPARTMENT
_____________________ Description and Operation General PASSENGER CABIN LINING AND INSULATION Description and Operation General Insulation Lining - Ceiling Lining - Sidewall INSULATION - SIDEWALL AND CEILING Removal/Installation Approved Repairs PANELS - LOWERED CEILING Removal/Installation PANELS - SCULPTURED CEILING Removal/Installation PANELS - SIDEWALL Removal/Installation PANELS - SIDEWALL LINING (AFT ENTRY AND AFT SERVICE DOORWAYS) Removal/Installation PANELS - SIDEWALL LINING (FORWARD ENTRY DOORWAY) Removal/Installation
Chapter SectionSubject_______ Page____ Effectivity___________
25-11-21 201 205 ALL
209
206
202
201
25-11-11 601 ALL
25-20-0025-21-01 1 1 ALL
25-21-39 1 1411 ALL
25-21-7125-21-4525-21-4625-21-25 401 801 401 401 401 ALLALLALLALLALL
25-21-31 401 ALL
401 ALL
25-CONTENTS
BEJ Page 2 Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL CHAPTER 25 - EQUIPMENT/FURNISHINGS TABLE OF CONTENTS
_________________
Chapter
Section
Subject_______ Subject_______ Page____
PANELS - SIDEWALL LINING 25-21-35
(FORWARD GALLEY DOORWAY)
Removal/Installation 401
WINDOW - INNER AND SHADE 25-21-12
Maintenance Practices 201
Install Down-Closing Shade 207
Install Exit Hatch Window 213
Shade.
Install Up-Closing Shade 208
Removal Exit Hatch Window 212
Shade
Window Assembly Adjustment 210
SEATS - PASSENGER 25-22-00
Description and Operation 1
General 1
Maintenance Practices 201
Recline Mechanism Lock - 212
Removal/Installation
Seat - Adjust 213
Seat - Removal/Installation 201
SERVICE UNITS 25-23-00
General 1
Description and Operation 1
Attendant Service Units 1
(ASU's)
Lavatory Service Units (LSU's) 1
Passenger Service Units 1
(PSU's)
PSUS - PASSENGER CABIN 25-23-61
Maintenance Practices 201
Install PSU 205
PSU's 212
Adjust PSU 212
Remove PSUs 201
Spacer Panel 207
Removal/Installation 207
Spacer Panel 208
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS