• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE: The load side of the circuit breaker is the terminal closest
____
 to the P6-4 panel hinge line.

 S 485-076
 (11) On the Fluke 87 multimeter, make sure the meter shows OL when attached or touched to each circuit breaker.
 (a)  If the meter does not indicate OL when a GCU circuit breaker is touched, do these steps: 1) Replace the GCU (AMM 24-21-81/401) 2) Remove the main battery (AMM 24-31-11/201) 3) Install a main battery that has been reconditioned in
 accordance with the battery manufacturer's component maintenance manual (AMM 24-31-11/201).
 S 085-079
 (12)
 Remove the red lead from circuit breaker and the black lead from the M400 Power System Test module (-) DC jack.

 (13)
 On the P5-13 panel, put the BAT switch in the OFF position.

 (14)
 Close the P6-4 panel.


 S 765-078
 S 865-084
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-81
 ALL  ú ú 01 Page 507 ú Mar 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 865-083
 (15) On the P6-4 panel, close these circuit breakers: 6D9 or 6D10 Control Generator No. 1, (C4) 6D10 or 6D11 Control Generator No. 2, (C5) 6D11 or 6D12 Control Generator APU, (C6)
 (a)  On the P5-4 panel, put the STANDBY POWER switch to the AUTO position.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-21-81
 ALL  ú ú 01 Page 508 ú Mar 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 MANUAL CONTROL - MAINTENANCE PRACTICES (APPLY POWER)
____________________________________________________
 1.  General_______
 A.  This procedure contains eight tasks:
 (1)  
A task to supply external power to the buses

 (2)  
A task to remove external power from the buses

 (3)  
A task to supply power to the ground service buses only

 (4)  
A task to remove power from the ground service buses only

 (5)  
A task to supply the APU generator power to the buses

 (6)  
A task to remove the APU generator power from the buses

 (7)  
A task to supply the power from the engine-driven generator to the buses

 (8)  
A task to remove the power from the engine-driven generator from the buses.

 B.  
The tasks give steps to energize the ac and dc buses for maintenance or ground servicing. The tasks also give steps to remove electrical power from the airplane.

 C.  
Each task that removes power gives instructions to move the BAT switch to the OFF position. If you let the BAT switch stay in the ON position without ac power, the electrical power of the battery will decrease. The electrical power of the battery can decrease at a rate of 30 to 40 amps. At this rate, the battery will have no electrical power after one to two hours.

 D.  
When the external air temperature is more than 100°F (37.8°C), electrical equipment can become too hot. If you supply electrical power for more than 20 minutes, you can supply conditioned air (AMM 21-00-00/201) to keep the electrical equipment cool.


 TASK 24-22-00-862-001
 2.  Supply External Power to the Buses (Fig. 201)__________________________________
 A.  General
 (1)  
The airplane has an external power receptacle near the nose wheel well. You will connect external ac power to the receptacle to connect electrical power to the buses.

 B.  
Standard Tools and Equipment

 (1)  
External power supply 115/200 volt ac, 3-phase, 400 Hz

 C.  
Access

 (1)  
Location Zone
 202 Lower Nose Compartment

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-22-00
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 电源 ELECTRICAL POWER(128)