• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-12 10:20来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (5)  
IPC 32-12-01 Fig. 2, IPC 32-12-08 Fig. 1

 (6)  
SWPM 20-20-00

 C.  
Access

 (1)  
Location Zone
 732 Wing Landing Gear Door, LH
 742 Wing Landing Gear Door, RH


 D.  
Prepare for the Installation


 S 224-011
 (1)  
Examine the outboard door hinge and attach points of the radius rod for wear limits (Ref 32-12-01/601).

 (2)  
Set the door with the sling assembly for installation.


 S 424-012
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-12-01
 ALL  ú ú 01 Page 404 ú Oct 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 E.  Install the Outboard Door on the Wheel Well
 S 434-013
 (1)  
Install hinge bolts as shown in details A and B, Fig. 401.

 (a)
Put one washer between the bolt head and the hinge.


 1)  Put the necessary number of washers between the nut and the hinge.
 NOTE:  The clearance between the nut and the hinge is 0.01 to 0.06 inches after you install the nut.
 (b)  
Engage the nut the minimum distance necessary to install the cotter pin.

 (c)  
Make sure that the clearance between the nut and the washers is


 0.01 to 0.06 inches.
 (d)  Install the cotter pin.
 S 434-014
 (2)  
Install the bonding jumper (SWPM 20-20-00).

 S 434-015

 (3)
Install the bushings in the bracket support of the radius rod.

 S 434-016

 (4)  
Connect the radius rods to the door.

 (a)  
Install the attachment bolts of the radius rod as shown in detail C, Fig. 401.

 (b)  
Tighten the radius rod nut from 135 to 300 pound-inches.

 (c)  
Install the cotter pin.


 1)  If the torque of the cotter pin is not in the specified range or the nut is below the minimum torque, do the steps below. a) Replace the nut or add washers below the nut. b) If it is necessary, replace the nut and add washers
 below the nut.
 S 824-017
 (5)  
Adjust the outboard door on the wheel well of the wing landing gear (Ref 32-12-00/501).

 S 644-018

 (6)  
Lubricate the outboard door on the wheel well of the wing landing gear (Ref 12-21-01/301).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-12-01
 ALL  ú ú 01 Page 405 ú Oct 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 094-022
 WARNING:_______ YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO REMOVE THE
 DOOR LOCKS FROM THE LANDING GEAR DOORS.  THE DOORS CAN CLOSE
 QUICKLY IF YOU DO NOT REMOVE THE DOOR LOCKS CORRECTLY.  THIS

 CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (7)  
Do this task: "Removal of the Door Locks from the Wing Landing Gear" (Ref 32-00-30/201).

 S 094-024

 (8)  
Do this task: "Removal of the Door Locks from the Body Landing Gear" (Ref 32-00-30/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-12-01
 ALL  ú ú 01 Page 406 ú Jun 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 WING LANDING GEAR WHEEL WELL OUTBOARD DOOR - INSPECTION/CHECK
_____________________________________________________________
 1.  General_______
 A.  This procedure contains a task to examine the outboard door on the wheel well of the wing landing gear for worn areas. The parts to examine are the hinge assemblies of the outboard door and the attach points of the linkage rod.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 2(96)