(b) Use the door locks to open the door fully with the rigging pin
in its position.
(c) Examine the full open dimension (distance from the buttock
plane zero to the door midfold hinge) at the front end of the
door (View A, Fig. 505).
NOTE:____ Hang a plumb bob at point E and Y (Views B and C,
Fig. 505) to get the buttock plane zero. The airplane
must have the usual load distribution, the equal tire
and the shock strut inflation. Put a floor mark label
on the floor below each plumb bob point. Write a line
between the two points.
(d) Make sure that you keep the strikeboard maximum dimension of
13.35 inches and minimum dimension of 1.55 inches (View B-B,
Fig. 508).
(e) If you can not install the rigging pin or if you can not keep
the dimensions, adjust the door.
S 865-159
(7) Pressurize the hydraulic system No. 1 and 4 (AMM 29-11-00/201).
S 865-160
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE DOOR
_______ OPERATION PATHS. DO NOT MOVE THE DOORS TOO QUICKLY. IT CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(8)
Operate the release handle to close and open the wheel well doors for the wing and body landing gears.
S 865-161
(9)
Remove the pressure from hydraulic systems No. 1 and 4 (AMM 29-11-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-12-00
ALL ú ú 08 Page 552 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 835-163
(10)
Repeat the check of the rigging pin installation, the door open dimension and of the strike board dimensions.
(a)
Do a check for the installation of the rigging pin (WD-1 LH, WD-2 RH) at point A (Fig. 502).
(b)
Use the door locks to open the door fully with the rigging pin in its position.
(c)
Examine the full open dimension (distance from the buttock plane zero to the door midfold hinge) at the front end of the door (View A, Fig. 505).
NOTE: Hang a plumb bob at point E and Y (Views B and C,
____ Fig. 505) to get the buttock plane zero. The airplane must have the usual load distribution, the equal tire and the shock strut inflation. Put a floor mark label on the floor below each plumb bob point. Write a line between the two points.
(d) Make sure that you keep the strikeboard maximum dimension of
13.35 inches and minimum dimension of 1.55 inches (View B-B, Fig. 508).
(e)
If you can install the rigging pin or if you can not keep the dimensions, adjust the door.
J.
Do The Last Door System (Fig. 503 and 504)
S 865-165
(1) Pressurize the hydraulic systems No. 1 and 4
(AMM 29-11-00/201).
S 865-166
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE DOOR
_______ OPERATION PATHS. DO NOT MOVE THE DOORS TOO QUICKLY. IT CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(2) Operate the release handle to close the wheel well doors for the wing and body landing gear.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-12-00
ALL ú ú 10 Page 553 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(3) S 865-167Remove the pressure from hydraulic systems No. 1 and 4 (AMM 29-11-00/201).
(4) S 835-168Make sure that the inboard and outboard wheel well doors align as shown (Fig. 503 and 504).
S 865-169
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE DOOR
_______ OPERATION PATHS. DO NOT MOVE THE DOORS TOO QUICKLY. IT CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(5)
Operate the release handle to open the wheel well doors for the wing and body landing gears.
S 865-170
(6)
Pressurize the hydraulic systems No. 1 and 4 (AMM 29-11-00/201).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 2(93)