(3)
D00128 Petrolatum - VV-P-236
C.
References
(1)
07-11-01/201, Jacking Airplane
(2)
12-15-03/301, Wing Landing Gear Shock Strut
(3)
32-00-30/201, Landing Gear Door Locks
D.
Access
(1)
Location Zone
735 Wing Landing Gear, LH
745 Wing Landing Gear, RH
E.
Install the Charging Valve and Seal
(1)
Install the ground locks in all landing gear (Ref 09-11-00/201).
S 864-034
S 864-035
WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO INSTALL
_______ THE DOOR LOCKS ON THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(2) Do this task: "Installation of the Door Locks on the Wing Landing Gear" (Ref 32-00-30/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-11-31
ALL ú ú 01 Page 404 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(3) S 494-038Do this task: "Installation of the Door Locks on the Body Landing Gear" (Ref 32-00-30/201).
(4) S 644-014Lubricate new T-ring and O-ring seals with hydraulic oil.
(5) S 644-015Apply a light layer of petrolatum on seals.
(6) S 424-016Put the seals on the adapter of the air charging valve and the upper bulkhead.
(7) S 434-017Set the air valve adapter into the shock strut and keep the tube end down and vertical.
(8) S 624-018Apply corrosion preventive compound to threads of the mounting nut on the air valve.
(9) S 434-019Install the mounting nut on the air valve with new o'ring seal and tighten to 50-70 pound-foot torque.
S 624-020
(10)
Apply a bead of corrosion preventive compound fully around the flange corner of the packing retainer.
S 434-021
(11)
Install the packing retainer with new O-ring seals.
S 624-022
(12)
Apply a small quantity of corrosion preventive compound to the threads of the upper bulkhead nut.
S 434-023
(13)
Lift the upper bulkhead in its position on top of the shock strut.
S 624-024
(14)
Apply a brush layer bead of corrosion preventive compound fully around the joint.
S 434-025
(15)
Install the upper bulkhead nut.
(a)
Use a torque adapter and tighten the nut from 105 to 125 pound-feet torque.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-11-31
ALL ú ú 01 Page 405 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(b) If it is necessary, loosen the nut and align to the nearest locking tab slot.
S 094-026
(16)
Remove the upper seal replacement tool.
S 434-027
(17)
Install the locking tab and lockwire with double twist procedure.
S 624-028
(18)
Apply a bead of corrosion preventive compound fully all around the joints of the upper bulkhead.
F.
Put the Airplane to its Usual Condition
S 094-029
(1)
Remove the support equipment and lower the airplane
(AMM 07-11-01/201).
S 614-030
(2)
Lubricate the shock strut (Ref 12-15-03/301).
S 094-036
WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO REMOVE THE
_______ DOOR LOCKS FROM THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT REMOVE THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(3)
Do this task: "Removal of the Door Locks from the Wing Landing Gear" (Ref 32-00-30/201).
S 094-039
(4)
Do this task: "Removal of the Door Locks from the Body Landing Gear" (Ref 32-00-30/201).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 2(67)