S 864-014
(8)
Put the control handle in the DN position.
E.
Put the Airplane Back to Its Initial Condition.
S 864-022
(1)
Move the ground release handles for the nose landing gear and the main landing gear to the DOORS CLOSED position.
S 864-017
(2)
Remove the pressure from the hydraulic systems if it is not necessary (Ref 29-11-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-32-03
ALL ú ú 01 Page 407 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
WING LANDING GEAR DOWNLOCK-OPERATED SEQUENCE VALVE AND MECHANISM -
________________________________________________________________ REMOVAL/INSTALLATION
____________________
1. General_______
A. This procedure contains these four tasks:
(1)
The removal of the downlock-operated sequence valve for the wing landing gear
(2)
The installation of the downlock-operated sequence valve for the wing landing gear
(3)
The removal of the mechanism for the downlock-operated sequence valve for the wing landing gear
(4)
The installation of the mechanism for the downlock-operated sequence valve for the wing landing gear.
B.
To remove the sequence valve these operations are necessary:
(1)
Disconnect the hydraulic lines.
(2)
Remove the valve attach bolts.
(3)
Remove the valve and the lever mechanism.
(4)
Disconnect the valve from the lever mechanism.
C.
To install the sequence valve these operations are necessary:
(1)
Install the hydraulic fittings.
(2)
Install the lever mechanism.
(3)
Install the valve.
(4)
Connect the hydraulic lines.
(5)
Do a check for leaks.
D.
To remove the sequence valve mechanism these operations are necessary:
(1)
Remove the striker arm.
(2)
Disconnect the clevis assembly from the sequence valve.
(3)
Remove the clevis assembly and the lever assembly.
(4)
Disconnect the clevis assembly from the lever assembly.
(5)
Remove the roller from the lever.
E.
To install the sequence valve mechanism these operations are necessary:
(1)
Install the roller on the lever assembly.
(2)
Connect the clevis assembly to the lever assembly and the link.
(3)
Install the clevis assembly on the valve.
(4)
Install the attach bolts.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-32-04
ALL ú ú 01 Page 401 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(5)
Install the striker arm.
F.
The sequence valve correctly sequences hydraulic pressure from system No. 4 to the OPEN side of the door actuator. It hydraulically connects to the uplock-operated sequence valve.
G.
The downlock-operated sequence valve attaches to the structure. The sequence valve is near the top of the upper side strut of the wing landing gear. The striker arm connected to the strut operates the valve.
TASK 32-32-04-004-001
2. Wing Landing Gear Downlock-Operated Sequence Valve Removal
__________________________________________________________
A. References
(1)
09-11-00/201, Towing
(2)
29-11-00/201, Main Hydraulic Supply System
(3)
32-00-30/201, Landing Gear Door Locks
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 4(72)