• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-12 10:27来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

747-400 MAINTENANCE MANUAL
 D. Prepare for the Removal
 S 494-032
 WARNING: YOU MUST CAREFULLY INSTALL THE GROUND LOCKS IN ALL LANDING
_______ GEAR. AN ACCIDENTAL RETRACTION OF THE LANDING GEAR CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
 (1)
Install the ground locks in all landing gear (AMM 09-11-00/201).

 S 864-003

 (2)
Remove the pressure from hydraulic system 1 (AMM 29-11-00/201).


 S 494-004
 WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASKS BELOW TO INSTALL
_______ THE DOOR LOCKS ON THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (3)  
Do this task: "Wing Landing Gear Door Lock Installation"
 (AMM 32-00-30/201).


 S 494-033

 (4)  
Do this task: "Body Landing Gear Door Lock Installation"
 (AMM 32-00-30/201).


 S 864-005

 (5)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6, Main Power Distribution Panel
 1) 6C28, ALT LG EXT NOSE
 2) 6C31, ALT LG EXT BODY L
 3) 6C32, ALT LG EXT BODY R


 E.
Remove the Uplock Mechanism.


 S 034-006
 (1)  Disconnect each end of the uplock actuator and hold the actuator to one side (AMM 32-33-14/401).
 NOTE:____The uplock actuator is part of the assembly. It is not necessary to fully remove it when you remove the uplock mechanism. Do not disconnect the actuator hoses unless you must install a new actuator.
 S 034-007
 (2)  Disconnect the forward end of the rod that operates the sequence valve from the uplock assembly (AMM 32-33-07/401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-33-08
 ALL  ú ú 01 Page 402 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
SEE A
ELECTRICAL ACTUATOR
HYDRAULIC UPLOCK ACTUATOR
FWD LGDR1B LEFT LGDR2B RIGHT
TURNBUCKLE
LGDR1A LEFT LGDR2A RIGHT
UPLOCK ATTACH BOLT
UPLOCK-OPERATED SEQUENCE VALVE
RIGGING PIN AE/GD-9 LEFT
UPLOCK 
ATTACH BOLT 
(2 LOCATIONS) 
UPLOCK  BOLT 
ASSEMBLY 

A
Body Landing Gear Uplock Mechanism Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-33-08
 ALL  ú ú 01 Page 403 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


RUBBER SLEEVE
(1/2 INCH ID X 1/8 INCH THK)

CAUTION:DO NOT USE THIS TOOL IF THE RUBBER SLEEVE IS DAMAGED. EXAMINE THE SLEEVE FOR DAMAGE BEFORE AND AFTER USE. INSTALL A NEW SLEEVE IF IT IS DAMAGED. THE TOOL CAN CAUSE DAMAGE TO THE UPLOCK MECHANISM.
ACTUATING TOOL

LOCK CLOSED  LOCK OPEN

Uplock Actuating Tool
Figure 402

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-33-08
 ALL  ú ú 01 Page 404 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (3)  S 034-008Remove the two bolts that attach the forward end of the sequence valve bracket to the uplock assembly.
 (4)  S 034-009Remove the four bolts that attach the sequence valve bracket to the structure.
 (5)  S 014-034Move the valve and the bracket away to get to the mounting bolt.
 (6)  S 014-010Disconnect the uplock sensor (AMM 32-61-11/201).
 (7)  S 014-035Remove the clamps that attach the sensor conduit.
 (8)  S 034-036Loosen the conduit nut at the junction box.
 (9)  S 014-037Move the conduit away from the mechanism to permit the removal of the mechanism.
 S 034-011

 (10)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 4(141)