(g)
Make sure the bar on the valve slide is between the edges of the slot (detail C).
NOTE: The slot is on the aft end of the valve.
____
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-33-07
ALL ú ú 01 Page 403 ú Feb 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 094-007
WARNING:_______ YOU MUST CAREFULLY DO THE STEPS IN THE TASKS BELOW TO REMOVE
THE DOOR LOCKS FROM THE LANDING GEAR DOORS. THE DOORS CAN
CLOSE QUICKLY IF YOU DO NOT REMOVE THE DOOR LOCKS CORRECTLY.
THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(2)
Do this task: "Wing Landing Gear Door Lock Removal" (Ref 32-00-30/201).
S 094-010
(3)
Do this task: "Body Landing Gear Door Lock Removal" (Ref 32-00-30/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-33-07
ALL ú ú 01 Page 404 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
BODY LANDING GEAR UPLOCK MECHANISM - REMOVAL/INSTALLATION
_________________________________________________________
1. General_______
A. This procedure contains these two tasks:
(1)
The removal of the uplock mechanism for the body landing gear
(2)
The installation of the uplock mechanism for the body landing gear.
B.
To remove the uplock mechanism these operations are necessary:
(1)
Disconnect the uplock actuator.
(2)
Disconnect the operator rod from the uplock-operated sequence valve.
(3)
Disconnect the uplock sensor.
(4)
Disconnect the cables.
(5)
Remove the electrical actuator.
(6)
Remove the uplock mechanism.
C.
To install the uplock mechanism these operations are necessary:
(1)
Connect the rod to the uplock assembly.
(2)
Install the uplock sensor.
(3)
Connect the uplock actuator.
(4)
Connect the cables.
(5)
Adjust the cables.
(6)
Install the electrical actuator.
(7)
Do an operational test of the alternate extension system for the body landing gear.
(8)
Do an operational test of the extension and retraction system for the body landing gear.
(9)
Make sure the uplock-operated sequence valve aligns correctly.
TASK 32-33-08-004-001
2. Body Landing Gear Uplock Mechanism Removal (Fig. 401)__________________________________________
A. Special Tools and Equipment
(1)
30HME65B00161-950 Hoist, Landing Gear Uplock Assembly (Strap)
B.
References
(1)
AMM 09-11-00/201, Towing
(2)
AMM 29-11-00/201, Main Hydraulic Supply System
(3)
AMM 32-00-30/201, Landing Gear Door Locks
(4)
AMM 32-33-07/401, Body Gear Uplock-Operated Sequence Valve Mechanism
(5)
AMM 32-33-14/401, Body Gear Uplock Actuator
(6)
AMM 32-35-01/401, Alternate Extension System Electric Actuator
(7)
AMM 32-61-11/201, Body Gear Uplock Sensors
(8)
AIPC 32-33-06, Fig. 1, AIPC 32-33-08, AIPC 32-33-14, Fig. 2
C.
Access
(1)
Location Zone
755 Body Landing Gear, LH
765 Body Landing Gear, RH
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-33-08
ALL ú ú 01 Page 401 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A