TASK 32-33-07-004-001
2. Body Landing Gear Uplock-Operated Sequence Valve Mechanism Removal
__________________________________________________________________
A. References
(1)
09-11-00/201, Towing
(2)
32-00-30/201, Landing Gear Door Locks
(3)
IPC 32-33-06 Fig. 1
B.
Access
(1)
Location Zone
755 Body Landing Gear, LH
765 Body Landing Gear, RH
C.
Procedure
S 494-008
WARNING: YOU MUST CAREFULLY INSTALL THE GROUND LOCKS IN ALL LANDING
_______ GEAR. AN ACCIDENTAL RETRACTION OF THE LANDING GEAR CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(1) Install the ground locks in all landing gear (Ref 09-11-00/201).
S 494-003
WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASKS BELOW TO INSTALL
_______ THE DOOR LOCKS ON THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(2) Do this task: "Wing Landing Gear Door Lock Installation" (Ref 32-00-30/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-33-07
ALL ú ú 01 Page 401 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
SEEA
UPLOCK-OPERATED SEQUENCE VALVE
SEE B
UPLOCK
MECHANISM
A
NOTE:THE BAR MUST BE BETWEEN
THE EDGES OF THE SLOT.
ATTACH
C
BOLT
UPLOCK
MECHANISM
SEE C
ATTACH BOLT
UPLOCK-OPERATED SEQUENCE VALVEROD
B
Body Landing Gear Uplock-Operated Sequence Valve Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-33-07
ALL ú ú 01 Page 402 ú Feb 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
S 494-009
(3)
Do this task: "Body Landing Gear Door Lock Installation" (Ref 32-00-30/201).
S 024-004
(4)
Remove the sequence valve mechanism (Fig. 401):
(a)
Hold the rod against the valve spring pressure.
(b)
Remove the attach bolt that connects the rod to the uplock mechanism.
(c)
Release the spring pressure from the valve.
(d)
Remove the attach bolt that connects the rod to the valve clevis.
(e)
Remove the rod from the valve.
TASK 32-33-07-404-005
3. Body Landing Gear Uplock-Operated Sequence Valve Mechanism Installation
_______________________________________________________________________
A. References
(1)
09-11-00/201, Towing
(2)
32-00-30/201, Landing Gear Door Locks
(3)
IPC 32-33-06 Fig. 1
B.
Access
(1)
Location Zone
755 Body Landing Gear, LH
765 Body Landing Gear, RH
C.
Procedure
S 424-006
(1)
Install the sequence valve mechanism (Fig. 401):
(a)
Connect the rod to the valve clevis with thin washers adjacent to the bolt head and the nut.
(b)
Install the nut and the cotter pin.
(c)
Make sure the uplock hook is in the open (gear down) position.
(d)
Push the rod against the valve spring until the holes in the rod end and the uplock mechanism align.
(e)
Connect the rod to the uplock mechanism: 1) Install the attach bolt with the thin washers adjacent to the bolt head. 2) Install the large steel washers on the two sides of the rod
end bearing. 3) Install the nut and a cotter pin.
(f)
Make sure the uplock hook is in the open position.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 4(139)