• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:33来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANE WITH COLLINS WXR-700X WEATHER ú

 34-41-81

 RADAR SYSTEM  ú
 ú 04 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 401Jul 15/93 

A 737-300/400/500MAINTENANCE MANUAL

Weather Radar Receiver/Transmitter Mount Blower Assembly Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANE WITH COLLINS WXR-700X WEATHER ú

 34-41-81

 RADAR SYSTEM  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 402Nov 15/91 

A
737-300/400/500MAINTENANCE MANUAL
 (2)  
34-41-02/501, Weather Radar System

 (3)  
34-41-41/401, Weather Radar Receiver/Transmitter


 B. Access
 (1)  Location Zone
 201 Lower Nose Compartment

 C. Procedure
 S 864-004
 (1)  Make sure this circuit breaker is open with a DO-NOT-CLOSE tag attached:
 (a)  P6 Load Control Center - Right
 1) WEATHER RADAR R/T

 S 424-009
 (2)  Install the blower assembly on the R/T mount:
 (a)  
Remove the dust caps from the electrical connectors on the R/T mount and on the blower assembly.

 (b)  
Put the blower assembly on the R/T mount.

 (c)  
Attach the blower assembly to the R/T mount with the four screws.

 (d)  
Connect the electrical connector to the blower assembly.


 S 214-010
 (3)  
Make sure the screws and lock washers that attach the waveguide to the R/T mount waveguide are correctly installed.

 S 214-005

 (4)  
Make sure the R/T mount is correctly installed on the shelf assembly.

 S 214-012

 (5)  
Make sure the electrical connectors for the R/T mount are correctly installed.

 (6)  
Supply electrical power (Ref 24-22-00/201).

 S 864-006

 (7)  
Remove the DO-NOT-CLOSE tag and close this circuit breaker:


 S 864-025
 (a)  P6 Load Control Center - Right
 1) WEATHER RADAR R/T

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANE WITH COLLINS WXR-700X WEATHER ú

 34-41-81

 RADAR SYSTEM  ú
 ú 06 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 403Mar 15/98 

A
737-300/400/500MAINTENANCE MANUAL
 S 414-019
 (8)  Do this task to install the R/T on the R/T mount: Receiver/Transmitter Installation (AMM 34-41-41/401).
 S 714-040
 WARNING:_______DO NOT TOUCH THE R/T MOUNT CONNECTOR. AC AND DC VOLTAGES ARE PRESENT WHEN THE WEATHER RADAR CIRCUIT BREAKERS ARE IN THE CLOSED POSITION AND COULD CAUSE INJURY TO PERSONS.
 (9)  Do a test of the blower assembly on the R/T mount:
 (a)  Push the PUSH TO TEST BLOWER switch.
 1) Make sure the blower comes on.

 S 714-029
 (10)
 Do the operational test for the weather radar system (Ref 34-41-02/501).

 (11)
 Remove electrical power if it is not necessary (Ref 24-22-00/201).


 S 864-036
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANE WITH COLLINS WXR-700X WEATHER ú

 34-41-81

 RADAR SYSTEM  ú
 ú 08 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 404Mar 15/98 

A
737-300/400/500MAINTENANCE MANUAL
 WEATHER RADAR CONTROL PANEL - REMOVAL/INSTALLATION
__________________________________________________
 1.  General
_______
 A.  This subject has two tasks. The first task is for the removal of the weather radar (WXR) control panel. The second task is for the installation of the WXR control panel.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 3(98)