• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:33来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 34-31-02

 ú ú 03.1 Page 530 ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (y) Adjust the output of the ramp test set to supply glide slope up and down signals in turn. 1) Make sure the glide slope pointers in the two EADIs and the two EHSIs follow the signal change. (z) Set the VHF NAV transfer switch to the NORMAL position. (aa) Set the mode selector on the standby attitude/ILS indicator to the OFF position.
 S 865-019
 (2)  Turn off the test set and remove it.
 S 865-020
 (3)  Remove electrical power if it is not necessary (AMM 24-22-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù.
 AIRPLANES WITH EFIS ú


 34-31-02

 ú ú ú ú 01.101 Page 531 ú ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 VOR/LOC ANTENNA - REMOVAL/INSTALLATION
______________________________________
 1.  General
_______
 A.  This subject has two tasks. The first task is the removal of the VOR/LOC antenna. The second task is the installation of the VOR/LOC antenna and a test of the VOR/LOC antenna.
 TASK 34-31-11-004-001
 2.  VOR/LOC Antenna Removal (Fig. 401)
_______________________
 A.  General
 (1)  The VOR/LOC antenna (M41) is installed at the top of the vertical stabilizer fin (Fig. 401).
 B.  Access
 (1)  Location Zone
 707 Vertical Stabilizer Tip

 C.  Procedure
 S 024-004
 (1)  Remove the VOR/LOC antenna:
 (a)  
Remove the screws that attach the leading edge to the antenna.

 (b)  
Remove the leading edge.

 (c)  
Disconnect the coaxial cables from the antenna.

 (d)  
Install dust caps on the electrical connectors.

 (e)  
Remove the screws that attach the antenna to the airplane structure.


 NOTE: Do not remove the screws that attach the trailing edge
____
 to the antenna.


 (f)  
Remove the antenna and the trailing edge.

 (g)  
If it is necessary: Remove the trailing edge from the antenna: 1) Remove the screws that attach the trailing edge to the


 antenna. 2) Remove the trailing edge from the antenna.
 TASK 34-31-11-404-005
 3.  VOR/LOC Antenna Installation (Fig. 401)
____________________________
 A.  General
 (1)  The VOR/LOC antenna (M41) is installed at the top of the vertical stabilizer fin (Fig. 401).
 B.  Consumable Materials
 (1) G00009 Corrosion Preventive (Dow Corning No. 4) - BMS 3-23.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-31-11

 ALL  ú ú 01 Page 401 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 C.
D.
E.
A
737-300/400/500MAINTENANCE MANUAL
References
 (1)  
SWPM 20-20-00, Standard Wiring Practices Manual

 (2)  
AMM 24-22-00/201, Manual Control

 (3)  
AMM 34-31-00/501, VOR/ILS Navigation System

 (4)  
AMM 34-31-02/501, VOR/ILS Navigation System

 (5)  
AMM 51-21-31/701, Corrosion Removal and Control

 (6)
SRM 51-20-01Access

 (1)  
Location Zone 707 Vertical Stabilizer Tip


Procedure
 S 114-023
 (1)  
Clean the mating surfaces of the antenna and the airplane structure (AMM 51-21-31/701).

 S 394-024

 (2)  
Apply a layer of BMS 3-23 corrosion-preventive compound to the mating surfaces of the antenna and the airplane structure (SRM 51-20-01).

 S 424-007

 (3)  
Install the VOR/LOC antenna:

 (a)  
If the trailing edge is not installed, attach the trailing edge to the antenna.

 (b)  
Align the antenna and the trailing edge with the screw holes on the top of the vertical fin.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 3(16)