• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:33来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 B.  The waveguide switch is installed on a bracket aft of the forward pressure bulkhead in the lower nose compartment. The bracket is found adjacent to the WXR receiver/transmitter mount.
 TASK 34-41-71-024-001
 2.  Waveguide Switch Removal________________________
 A.  Access
 (1)  
Location Zone
 102 Lower Nose Compartment


 (2)  
Access Zone
 1103 Forward Access Panel

 

 B.  Procedure
 S 864-002
 (1) Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P6 Load Control Center - Right
 1) WEATHER RADAR AC
 2) WEATHER RADAR DC

 S 014-008
 (2)  
Open the forward access door (1103) to get access to the waveguide switch.

 S 024-009

 (3)  
Remove the waveguide switch with the dummy load:

 (a)  
Disconnect the electrical connector from the waveguide switch.

 (b)  
Remove the four screws and lockwashers that attach waveguide section 2 to the No. 2 port on the waveguide switch.

 


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH SPERRY PRIMUS 90 WEATHER ú

 34-41-71

 RADAR SYSTEM  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 401Nov 15/92 

A 737-300/400/500MAINTENANCE MANUAL
SEE A
RECEIVER/TRANSMITTER

SCREW (4)
LOCKWASHER (4)
WAVEGUIDE SWITCH BRACKET
WAVEGUIDE FLANGE
SCREW (4)
LOCKWASHERS (4)
GASKET (1)


WAVEGUIDE 
SECTION 1
WAVEGUIDE 
SECTION 2 
WAVEGUIDE 
SCREW (4)  SECTION 3 
LOCKWASHER (4) 
SCREW (4) 
ELECTRICAL  LOCKWASHER (4) 
CONNECTOR 
WAVEGUIDE SWITCH 
FWD  AND DUMMY LOAD 

Weather Radar Waveguide Switch Installation 
Figure 401 

A96859
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH SPERRY PRIMUS 90 WEATHER ú

 34-41-71

 RADAR SYSTEM  ú
 ú 01 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.  Page 402Nov 15/92 

A
737-300/400/500MAINTENANCE MANUAL
 (c)  
Remove the four screws and lockwashers that attach waveguide section 2 to section 1.

 (d)  
Remove waveguide section 2 and its gasket.

 (e)  
Remove the four screws and lockwashers that attach waveguide section 3 to the No. 3 port on the waveguide switch.

 (f)  
Hold the waveguide switch and remove the four screws and lockwashers that attach the switch to the waveguide switch bracket.

 (g)  
Remove the waveguide switch and dummy load.


 NOTE: The dummy load is attached to the waveguide switch
____
 with four screws.

 (h)  Put dust caps on the electrical connector and on the waveguides and the waveguide switch.
 TASK 34-41-71-424-015
 3. Waveguide Switch Installation
_____________________________
 A. References
 (1)  
24-22-00/201, Manual Control

 (2)  
34-41-00/501, Weather Radar System


 B. Access
 (1)  
Location Zone
 102 Lower Nose Compartment


 (2)  
Access Zone
 1103 Forward Access Panel

 

 C. Procedure
 S 864-009
 (1)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P6 Load Control Center - Right
 1) WEATHER RADAR AC
 2) WEATHER RADAR DC

 S 014-010
 (2)  
Open the forward access door (1103) to get access to the waveguide switch.

 S 424-011

 (3)  
Install the waveguide switch with the dummy load:


 (a)  Remove the dust caps from the electrical connector, the waveguides and the waveguide switch.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH SPERRY PRIMUS 90 WEATHER ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 3(96)