• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:33来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

MAGENTA
TRK 127 M
RED
YELLOW
40
WXR

GREEN
TEST
HALF
RANGE
MESSAGE


TEST MODE DISPLAY
TRK  ---M 
LRU'S FAILED OR FAIL STATUS MESSAGE  FAIL WXR RT ANT WXR RANGE DISAGREE  DISAGREE RANGE MESSAGE 
STATUS AND FAULT DISPLAY 

Weather Radar Test and Fault Displays
Figure 101

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 34-41-02
 ú ú 03 Page 105 ú Nov 15/96

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C38771
A 737-300/400/500MAINTENANCE MANUAL

Weather Radar Failure Isolation Procedures
Figure 102 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 34-41-02

 ú ú 03 Page 106 ú Nov 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
E62649
A 737-300/400/500MAINTENANCE MANUAL

Weather Radar Failure Isolation Procedures
Figure 102 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 34-41-02
 ú ú 04 Page 107 ú Mar 15/97

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

Weather Radar EHSI Failure Isolation Procedures
Figure 102 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 34-41-02

 ú ú 02 Page 108 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
F11288
A 737-300/400/500MAINTENANCE MANUAL

Weather Radar Failure Isolation Procedures
Figure 102 (Sheet 4)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 34-41-02
 ú ú 02 Page 109 ú Jul 15/97

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
G40555
A
737-300/400/500MAINTENANCE MANUAL
 WEATHER RADAR SYSTEM - ADJUSTMENT/TEST
______________________________________
 1.  General_______
 A.  This subject contains three tasks: the operational test, the system test, and the system shutdown procedure. The operational test uses the self test circuits to make sure the weather radar system is serviceable. The system test makes sure all function of the weather radar operate correctly. The system shutdown procedure is used to set the weather radar system and other related airplane equipment back to their usual condition.
 TASK 34-41-02-715-029
 2.  Operational Test - Weather Radar System_______________________________________
 A.  General
_______
 (1)  
The operational test has these parts:

 (a)  
The prepare for a weather radar system operational test.

 (b)  
The weather radar system self test.

 (c)  
The test of the antenna TILT control.

 

 (2)  
The self-test uses the TEST switch on the WXR control panel or indicator. In the TEST mode, the self-test circuits monitor the performance of the weather radar system.

 (3)  
The weather radar control panel is referred to as the WXR control panel.

 (4)  
During the self test the weather radar system operates as follows:

 (a)  
It makes a test pattern which finds most system failures without test equipment.

 (b)  
The receiver/transmitter operates for 1 second.

 (c)  
A special test pattern is made on the EHSIs.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 3(75)