• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 23:33来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 

 S 864-019
 (5)  For the first officer's HSI transfer switch, remove the DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  
P18 Load Control Center - Left
 1) INSTR XFR


 (b)  
P6 Load Control Center - Right
 1) VOR/LOC-2
 2) F/O PNL LTS 28V PRIMARY

 

 S 864-020
 (6)  Do this task to supply electrical power: Manual Control
 (Ref 24-22-00/201)

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITHOUT EFIS ú

 34-31-81

 ú ú 03 Page 404 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (7)  S 714-021Set the HSI transfer switch in the VOR/ILS position. (a) Make sure a VOR/ILS annunciation shows on the HSI.
 (8)  S 714-022Set the HSI transfer switch in the NAV position. (a) Make sure a NAV annunciation shows on the HSI.
 (9)  S 864-023If electrical power is not necessary, do this task to remove electrical power: Manual Control (AMM 24-22-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITHOUT EFIS ú

 34-31-81
 ú ú 03 Page 405 ú Nov 15/98

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TRANSFER SWITCHES - REMOVAL/INSTALLATION
________________________________________
 1.  General_______
 A. This subject has two tasks:
 (1)  
The first task is the removal of the VHF NAV transfer switch.

 (2)  
The second task is the installation and test of the VHF NAV transfer switch.


 TASK 34-31-82-004-001
 2.  VHF NAV Transfer Switch Removal_______________________________
 A. General
 (1)  
The VHF NAV transfer switch is a part of the instrument switching module. To replace the VHF NAV transfer switch, replace the instrument switching module.

 (2)  
The instrument switching module is on the forward overhead panel (P5).


 B. Access
 (1)  Location Zone
 101, 102 Control Cabin

 C. Procedure
 S 864-002
 (1)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  
P18 Load Control Center - Left
 1) INSTR XFR


 (b)  
P6 Load Control Center - Right
 1) OVERHEAD 28V PRIMARY

 

 S 024-003
 (2)  Remove the instrument switching module:
 (a)  
Remove the edge light panel from the module.

 (b)  
Remove the screws from the module.

 (c)  
Pull the module from the panel to get access to electrical connectors on the rear of the module.

 (d)  
Disconnect the electrical connectors from the module.


 TASK 34-31-82-404-012
 3.  VHF NAV Transfer Switch Installation____________________________________
 A. General
 (1)  
The VHF NAV transfer switch is part of the instrument switching module. To replace the VHF NAV transfer switch, replace the instrument switching module.

 (2)  
The instrument switching module is on the forward overhead panel (P5).


 B. References
 (1)  
24-22-00/201, Manual Control

 (2)  
34-31-02/501, VOR/ILS Navigation System


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 34-31-82
 ú ú 02 Page 401 ú Jul 15/91

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 C. Access
 (1)  Location Zone
 101, 102 Control Cabin

 D. Procedure
 S 864-013
 (1)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 导航 NAVIGATION 3(35)