• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1.  General_______
 A.  This procedure has these tasks:
 (1)  
A removal of the vertical support tube

 (2)  
An installation of the vertical support tube.

 B.  
You can remove the vertical support tube with the APU installed. You must support the APU with a fishpole hoist and an APU rear mount sling while you remove the vertical support tube. The location of the vertical support tube is on the top aft side of the APU.

 C.  
The truss assembly is referred to as the vertical support tube.


 TASK 49-13-04-004-001
 2.  Vertical Support Tube Removal (Fig. 401, Fig. 402)_____________________________
 A.  References
 (1)  
AMM 26-15-02/401, APU Fire Detector

 B.  
Equipment

 (1)  
PF51-002-1 Hoist - Fishpole, Manual Powered
 06714 P. F. Industries Inc.
 151 S. Michigan St., Seattle, WA 98108-3225 or


 (2)  
AP6108 Hoist - Fishpole, Advanced Chain-Driven
 Morgan Aero Products
 2719 Pacific Avenue, Everett, WA 98201


 (3)  
2OHME65B00780-1 Sling - APU Rear Mount

 C.  
Access

 (1)  
Location Zones
 221 Control Cabin - Left
 222 Control Cabin - Right
 310 Fuselage - Station 2360 to Station 2792


 (2)  
Access Panels
 317AL APU Access Door - Left
 318AR APU Access Door - Right


 D.  
Prepare for the Removal


 S 864-002
 (1)  
Make sure the APU control switch on the P5 overhead panel is OFF and attach a DO-NOT-OPERATE tag.

 S 864-003

 (2)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6-2 Main Power Distribution Panel
 1) 6K18, APU ALTN CONT


 (b)  
P83 Aft APU Equipment Control and Circuit Breaker Panel 1) APU PRIME CONT


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 49-13-04
 ALL  ú ú 01 Page 401 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 014-025
 (3)  
Open the left APU access door, 317AL, and right APU access door, 318AR:

 (a)  
While you hold the two APU access doors in the closed position, open the six latches on the right access door.


 NOTE: The left access door will open fully and the right
____ access door will drop approximately one inch (2.5 cm) from the fuselage frame when the last latch is opened.
 NOTE: A lanyard is attached to the aft end of the right access
____ door to hold the access door to the APU compartment bulkhead.
 CAUTION: BE CAREFUL NOT TO MOVE THE TWO APU ACCESS DOORS TO THE
_______ OUTBOARD SIDE FROM THE FULL OPEN POSITION. THE FULL OPEN POSITION IS WHERE THE APU ACCESS DOOR IS DOWN AND THE TWO HOLD-OPEN RODS ARE CONNECTED TO THE TWO BRACKETS ON THE APU COMPARTMENT BULKHEAD. DAMAGE TO THE ELEVATOR CONTROL SURFACES CAN OCCUR.
 (b)  
Open the left access door to the fully open position and remove the two hold-open rods from the two clips.

 (c)  
Remove the two quick-release pins from the two brackets on the left APU compartment bulkhead.

 (d)  
Connect the two hold-open rods from the left access door to the two brackets and install the two quick-release pins.

 (e)  
Push the right access door up and remove the lanyard from the pin on the aft APU compartment bulkhead.

 (f)  
Open the right access door to the fully open position and remove the two hold-open rods from the two clips.

 (g)  
Remove the two quick-release pins from the two brackets on the right APU compartment bulkhead.

 (h)  
Connect the two hold-open rods from the right access door to the two brackets and install the two quick-release pins.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 49-13-04
 ALL  ú ú 01 Page 402 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 1(70)