• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (c)  
Remove the DO-NOT-OPERATE tag from the APU control switch on the P5 overhead panel.

 (d)  
Do this task: APU Starting and Operation (AMM 49-11-00/201).

 (e)  
Operate the APU for a minimum of five minutes.

 (f)  
During the APU operation, examine the flange of the load compressor diffuser duct for signs of air leakage.

 (g)  
Do this task: APU Usual Shutdown (AMM 49-11-00/201).

 (2)
If you find air leakage, then do these steps to repair the leakage:


 S 366-037
 NOTE: It is necessary to cure the silicone adhesive sealant for 24
____
 hours.

 (a)  Make sure the APU control switch on the P5 overhead panel is OFF and attach a DO-NOT-OPERATE tag.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-21-00
 ALL  ú ú 02 Page 628 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 (b)


(c)


(d)

(e)

(f)

(g)
 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 1(154)