C.
The air inlet door for the APU is on the right side of the fuselage. It is between the horizontal stabilizer and the vertical stabilizer. The actuator for the inlet door is in the APU compartment on the forward side of the air inlet duct. You can get access to the actuator through the APU access doors.
TASK 49-15-00-302-001
2. APU Air Inlet Door Deactivation In Closed Position (Manual Actuator___________________________________________________________________ Operation) (Fig. 201)__________
A. Special Tools and Equipment
(1)
G57NB-5 Collar - Circuit Breaker, Nylon Molding Corp., 1617 S. California, Monrovia, CA. 91016 (four are necessary)
B.
References
(1)
IPC 49-15-04 Fig. 1
C.
Access
(1)
Location Zone 318 APU Compartment-Upper Forward Side of Air Inlet Duct, RH
(2)
Access Panel
317AL APU Access Door
318AR APU Access Door
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 01 Page 201 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
A SEE A
BRACE A
SEE B
FWD BRACE COMPRESSOR AIR INLET PLENUM A DUCT SEAL AIR INLET
LINK
(OPEN) AIR INLET DOOR
SEE C
ACTUATOR CONTAINER SEE D
CONNECTOR ELECTRICAL
AIR INLET DUCT ACTUATOR B V-BAND CLAMP
Actuator Replacement Link Installation Figure 201 (Sheet 1)
F58287
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 02 Page 202 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
|0.060 INCH MAXIMUMLIP AIRPLANE OML
SEAL
AIR INLET DOOR
(CLOSED POSITION)
A-A
AIR INLET DOOR
CLEVIS PLATE
B
BOLT WASHERS (QTY 2) NUT
B LINK
BOLT WASHERS (QTY 2) B-B SPACER C NUT
CONTAINER
REPLACEMENT
LINK ASSEMBLY
TRANSFER NUT
SOCKET BOLT WASHERS (QTY 2) CLEVIS ADJUSTMENT NUT
LINK CLEVIS ASSEMBLY
SMALL JAMNUT
C
ADJUSTMENT INSTALL A BUSHING IF ONE IS
NUT LARGE
NOT IN THE LINK ASSEMBLY
JAMNUT
C-C C
D
Actuator Replacement Link Installation
Figure 201 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 01 Page 203 ú Oct 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
D. Procedure
S 862-002
(1)
Make sure the APU control switch on the P5 panel is OFF and attach a DO-NOT-OPERATE tag.
S 862-003
(2)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P6 Main Power Supply Panel
1) 6K18 APU ALTN CONT
(b)
P83 Panel, E8 Aft Equipment Center
1) AIR INLET DOOR
2) APU PRIMARY CONT
3) APU START
S 012-004
(3)
Open the APU access doors:
(a)
Open the latches on the APU access doors.
(b)
Open the APU access doors.
(c)
Engage the support rods for the APU access doors.
S 042-039
(4)
Do the deactivation of the air inlet door:
(a)
Remove the coverplate from the access hole on the actuator container for the manual override.
CAUTION: MAKE SURE TO SET THE TRANSFER SOCKET TO THE MANUAL
_______ POSITION BEFORE YOU OPERATE THE ACTUATOR WITH YOUR HANDS. DAMAGE TO THE ACTUATOR CAN OCCUR.
(b)
Turn the transfer socket for the electrical or manual operation to the MANUAL position.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 1(109)