• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Open the left access door to the fully open position and remove the two hold-open rods from the two clips.

 (c)  
Remove the two quick-release pins from the two brackets on the left APU compartment bulkhead.

 (d)  
Connect the two hold-open rods from the left access door to the two brackets and install the two quick-release pins.

 (e)  
Push the right access door up and remove the lanyard from the pin on the aft APU compartment bulkhead.

 (f)  
Open the right access door to the fully open position and remove the two hold-open rods from the two clips.

 (g)  
Remove the two quick-release pins from the two brackets on the right APU compartment bulkhead.

 (h)  
Connect the two hold-open rods from the right access door to the two brackets and install the two quick-release pins.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-11-00
 ALL  ú ú 14 Page 262 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 632-121
 (2)  
Remove all the plugs, caps, and the covers from the APU ports and the openings.

 S 632-122

 (3)  
Remove the dessicant bags and the humidity indicators from the APU exhaust duct.

 (a)  
Remove all the preservation tags.

 (b)  
Remove the collars and close these circuit breakers:
 1) P6-2 Main Power Distribution Panel
 a) 6K18, APU ALTN CONT

 

 2)  P83 Aft APU Equipment Control and Circuit Breaker Panel a) APU PRIME CONT
 S 412-390
 (4)  
Close the left APU access door, 317AL, and right APU access door, 318AR:

 (a)  
Remove the two quick-release pins, disconnect the two hold-open rods and put the two hold-open rods in the two clips on the right access door.

 (b)  
Install the two quick-release pins in the two brackets on the right APU compartment bulkhead.

 (c)  
Lift the right access door until you can install the lanyard on the pin at the aft APU compartment bulkhead.


 NOTE: The lanyard will hold the right access door on the APU
____
 compartment bulkhead.

 (d)  
Remove the two quick-release pins, disconnect the two hold-open rods and put the two hold-open rods in the two clips on the left access door.

 (e)  
Install the two quick-release pins in the two brackets on the left APU compartment bulkhead.

 (f)  
Make sure the insulation covers are correctly attach to the APU compartment firewall.

 (g)  
Lift the left access door until the two APU access doors are approximately aligned.

 (h)  
Close the two APU access doors.

 (i)  
Close the six latches on the right access door.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 49-11-00
 ALL  ú ú 14 Page 263 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 TASK 49-11-00-632-124
 18. APU Depreservation (29 Days to 90 Days)
_______________________________________
 A. General
 (1)  
This task gives the instructions for the depreservation of the APU. To do a depreservation of the APU is to put the APU back to a serviceable condition.

 B.
References

 (1)  
AMM 49-11-00/201, Auxiliary Power Unit

 C.
Access

 (1)  
Location Zones
 221 Control Cabin - Left
 222 Control Cabin - Right
 310 Fuselage - Station 2360 to Station 2792


 (2)  
Access Panels
 317AL APU Access Door - Left
 318AR APU Access Door - Right


 D.
Procedure


 S 012-391
 (1)  
Open the left APU access door, 317AL, and right APU access door, 318AR:

 (a)  
While you hold the two APU access doors in the closed position, open the six latches on the right access door.


 NOTE: The left access door will open fully and the right
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 1(39)