(c)
Attach the clevis to the container with the large locknut.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 01 Page 206 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
S 492-018
(5) Install the link and the container assembly:
(a) Put the link through the mounting hole in the wall of the air
inlet duct.
(b) Put your hand through the mounting hole and attach the link to
the air inlet door.
1) Install a lockwire on the nut.
S 822-019
(6) Measure the closed door to make sure it correctly aligns with the
fuselage:
(a) The door trailing edge must align in 0.060 inches (1.52 mm) or
less of the inlet lip.
(b) Adjust the door if it is necessary:
1) Loosen the large and the small locknuts on the clevis.
2) Turn the adjustment nut if it is necessary to align the
door to 0.040 inches (1.02 mm) of the inlet lip.
3) Tighten the small and the large locknuts on the clevis.
S 912-020
(7) Install a lockwire on the large and the small locknuts on the
clevis.
S 432-021
(8) Attach the electrical connector to the actuator container with the
nylon cord.
S 412-022
(9) Close the APU access doors:
(a) Do a visual check of the EGT bus bars:
1) Make sure the bus bars are not damaged.
2) Make sure no metal parts touch the bus bars.
3) Make sure the bus bars do not touch each other.
(b) Disengage the support rods for the APU access doors.
(c) Put the support rods in the clips on the inner side of the APU
access doors.
(d) Make sure the insulation covers correctly attach to the APU
compartment firewall.
(e) Close the APU access doors.
(f) Close the latches on the APU access doors.
S 862-023
(10)
Replace the DO-NOT-CLOSE tags with collars on these circuit breakers:
(a)
P83 Panel, E8 Aft Equipment Center 1) AIR INLET DOOR
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 03 Page 207 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
2) APU PRIMARY CONT
3) APU START
(b) P6 Main Power Supply Panel
1) 6K18 APU ALTN CONT
S 862-024
(11) Replace the DO-NOT-OPERATE tag on the APU control switch with an APU INOPERATIVE tag.
TASK 49-15-00-842-025
4. APU Air Inlet Door Activation (Fixed Link Removal) (Fig. 201)__________________________________________________
A. References
(1)
IPC 49-15-04 Fig. 1
B.
Access
(1)
Location Zone 318 APU Compartment-Upper Forward Side of Air Inlet Duct, RH
(2)
Access Panel
317AL APU Access Door
318AR APU Access Door
C.
Procedure
S 862-034
(1)
Make sure the APU control switch on the P5 panel is OFF and attach a DO-NOT-OPERATE tag.
S 012-026
(2)
Open the APU access doors:
(a)
Open the latches on the APU access doors.
(b)
Open the APU access doors.
(c)
Engage the support rods for the APU access doors.
S 032-027
(3) Remove the nylon cord that attaches the electrical connector to the actuator container.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 01 Page 208 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.