(16)
Connect all the disconnected drain lines.
S 416-026
(17)
Close the APU access doors:
(a)
Do a visual check of the EGT bus bars:
1) Make sure the bus bars are not damaged.
S 436-025
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-16-00
ALL ú ú 03 Page 608 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
2) Make sure no metal parts touch the bus bars. 3) Make sure the bus bars do not touch each other.
(b)
Disengage the support rods for the APU access doors.
(c)
Put the support rods in the clips on the inner side of the APU access doors.
(d)
Make sure the insulation covers correctly attach to the APU compartment firewall.
(e)
Close the APU access doors.
(f)
Close the latches on the APU access doors.
S 866-027
(18)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a)
P6 Main Power Distribution Panel
1) 6K18 APU ALTN CONT
(b)
P83 Panel, E8 Aft Equipment Center
1) APU PRIMARY CONT
S 866-028
(19) Remove the DO-NOT-OPERATE tag from the APU control switch on the P5 panel.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-16-00
ALL ú ú 01 Page 609 ú Oct 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
APU DRAINS AND VENTS - CLEANING AND PAINTING
____________________________________________
1. General_______
A. To clean the APU drains, the four primary drain lines must be disconnected at the drain collector bracket. The drain collector bracket is on the forward side of the load gearbox. From the drain collector bracket, four flexible lines send the fluids to the APU compartment firewall.
B. Forward of the firewall, steel tubes send the fluids to a drain mast and three overboard drain fittings. The shroud drain of the APU fuel line also goes to the drain mast. The drain for the exhaust duct is a flexible hose attached to an overboard drain fitting. It is necessary to keep these drains and vents clear.
TASK 49-16-00-107-001
2. Clean the APU Drain Lines (Fig. 701)_________________________
A. Standard Tools and Equipment
(1)
Compressed Air Source - 20 to 25 psig
B.
Consumable Materials
(1)
B00722 Solvent - Cleaning, P-D-680
C.
References
(1)
IPC 49-16-00 Fig. 1
D.
Access
(1)
Location Zone
317 APU Compartment, LH
318 APU Compartment, RH
(2)
Access Panel
317AL APU Access Door
318AR APU Access Door
(3)
Access Panel
315AL Compartment Directly Aft of the Stabilizer Box Compartment
E. Prepare to Clean the APU Drain Lines
S 867-002
(1)
Make sure the APU control switch on the P5 panel is OFF and attach a DO-NOT-OPERATE tag.
S 867-003
(2)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P6 Main Power Supply Panel
1) 6K18 APU ALTN CONT
(b)
P83 Panel, E8 Aft Equipment Center
1) APU PRIMARY CONT
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-16-00
ALL ú ú 01 Page 701 ú Jun 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
SEE C
SEE A
CHAMBER DRAIN COMBUSTION FUEL LINE SHROUD DRAIN DIVIDER AND DUMP VALVE, IGV ACTUATOR, FLOW (DIVERTER VALVE CONTROL, FUEL SYSTEM DRAIN -AND FMU)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 1(134)