A
APU Air Inlet Door Actuator Installation
Figure 401 (Sheet 1)
F58292
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-04
ALL ú ú 02 Page 402 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
|0.060 INCH LIP
MAXIMUM
AIRPLANE OML
SEAL
AIR INLET DOOR
(CLOSED POSITION)
(REF) A-A
7.
BOLT
8.
WASHERS (QTY 2)
10. BUSHING
AIR INLET DOOR 9. NUT
(REF)
6. CLEVIS PLATE
B
7.
BOLT
8.
WASHER (QTY 2)
9.
NUT
B-B B
1. LINK
23. CLEVIS
22. ADJUSTMENT
B
NUT
21. SMALL
LOCKNUT
3. ACTUATOR
20. LARGE 11. MANUAL OVERRIDE
LOCKNUT SOCKET
16. BOLT 12. TRANSFER SOCKET
17.
NUT
18.
WASHER (QTY 2)
19.
BUSHING (QTY 2)
COVERPLATE FOR THE MANUALELECTRICAL WIRE OVERRIDE ACCESS(REF) (REF)
5. ACTUATOR CONTAINER
4. ELECTRICAL PLUG DM8313. SCREW
14.
WASHER
15.
NUT (4 LOCATIONS)
C
APU Air Inlet Door Actuator Installation
Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-04
ALL ú ú 01 Page 403 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(b)
Open the APU access doors.
(c)
Engage the support rods for the APU access doors.
S 034-031
(4)
Remove the actuator container (5) from the air inlet duct:
(a)
Disconnect the electrical plug DM83 (4) from the receptacle on the actuator container (5).
(b)
Install caps on the electrical plug DM83 (4) and the receptacle to prevent contamination.
(c)
Loosen the V-band clamp (2).
CAUTION: MAKE SURE YOU REMOVE ALL THE UNWANTED MATERIAL THAT FALLS
_______ INTO THE AIR INLET PLENUM DURING THE REMOVAL. IT CAN BE NECESSARY TO REMOVE THE ACCESS PANELS ON THE INLET PLENUM TO REMOVE THE UNWANTED MATERIAL. MAKE SURE YOU REMOVE THE MATERIAL BEFORE YOU OPERATE THE APU. A FAILURE TO REMOVE THE UNWANTED MATERIAL BEFORE THE APU OPERATION CAN CAUSE DAMAGE TO THE APU.
(d)
Move the actuator container (5) until you can get access to the clevis plate (6) through the mounting hole in the air inlet duct.
(e)
Put your hand through the mounting hole and remove these parts that attach the link (1) to the clevis plate (6): 1) The bolt (7) 2) The washers (8) 3) The bushing (10) 4) The nut (9).
(f)
Remove the actuator container (5).
S 024-011
(5)
If it is necessary, remove the actuator (3) from the actuator container (5):
(a)
Remove the large locknut (20) from the end of the actuator (3).
(b)
Remove the screws (13), the washers (14), and the nut (15) from the electrical receptacle.
(c)
Remove the electrical receptacle from the container (5).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-04
ALL ú ú 01 Page 404 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(d)
Remove the bolt (16), the nut (17), the washers (18), and the bushings (19) that attach the clevis (23) to the actuator (3).
(e)
Remove the actuator (3) from the actuator container (5).
TASK 49-15-04-404-012
3. Air Inlet Door Actuator Installation (Fig. 401)____________________________________
A. References
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机载辅助动力 1(121)