Apply the grease to the friction surfaces of the no-back mechanism arc. Apply a thin smooth layer on the inner and outer radii of the arc.
 NOTE: We recommend the grease be applied only where the shoe
____ pins contact the inner and outer radii of the arc. Move the speed brake handle and/or actuator to access the entire arc. BMS 3-33 grease is not a replacement for MIL-G23827 grease for use on the no-back mechanism.
Retract the auto speed brake actuator by performing the following: 1) Close the following circuit breaker and remove the
 DO-NOT-CLOSE tag:
 a) P7, Overhead Circuit Breaker Panel
 7G6, SPEED BRAKE AUTO CONT

 2)  Open the following circuit breaker and attach a DO-NOT-CLOSE tag: a) P7, Overhead Circuit Breaker Panel
 7F3, HYDRAULICS HYDIM 1 3) Move the forward thrust lever number 1 or 3 to half throttle. 4) The actuator should retract, which will move the speed
 brake lever to the down and locked position.Move the speed brake lever from the DN and locked position to the full UP position 10 or more times.
 NOTE: This should be done with the actuator retracted and
____ extended to make sure the grease is applied to the arc of the no-back mechanism.
Extend the auto speed brake actuator by performing the
 following:
 1) Place the throttle levers at the idle position.
 2) Place the speed brake lever in the DN and locked position.
 3) Move the speed brake lever to the armed position.
 4) The actuator should retract, which will move the speed

 brake lever up.Open the following circuit breaker and attach a DO-NOT-CLOSE tag: 1) P7, Overhead Circuit Breaker Panel
 a) 7G6, SPEED BRAKE AUTO CONTMove the speed brake lever from the DN and locked position to the full UP position 10 or more times.Remove the grease that is not necessary at the end of the arc. Move the handle or the actuator for access as necessary.Move the speed brake lever to the DN and locked position.Close the following circuit breaker and remove the DO-NOT-CLOSE tag: 1) P7, Overhead Circuit Breaker Panel
 a)  7G6, SPEED BRAKE AUTO CONT
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-03
 ALL  ú ú 04 Page 211 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 862-037
 (8)  
Do a chatter test of the speed brake lever:

 (a)  
Move the speed brake lever to the DN and locked position.

 (b)  
Move the forward thrust lever number 1 or 3 to half throttle.

 (c)  
Move the speed brake lever to the armed position.

 WARNING:_______KEEP HANDS CLEAR OF THE SPEED BRAKE LEVER. THE ACTUATOR WILL MOVE THE LEVER UP WHICH CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.

 (d)  
Move the forward thrust lever to the idle position.

 (e)  
Move the speed brake lever manually to the DN and locked position 10 or more times.

 (f)  
Make sure that the lever binding and/or chattering has stopped. If not, replace the no-back mechanism: "Speed Brake Mechansim Removal" and "Speed Brake Mechanism Installation".


 S 712-026
 (9)  
Do this task: "Speed Brake Mechanism Operational Test"

 S 412-047

 (10)
 Install the ceiling lining panel that you removed (AMM 25-59-01/401).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-03
 ALL  ú ú 04 Page 212 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 GROUND SPOILER CONTROL VALVE - REMOVAL/INSTALLATION
___________________________________________________
 1.  General_______
 A.  There are two tasks in this procedure. There is a task for the removal and a task for the installation of the ground spoiler control valve.
 (1)
The removal of the ground spoiler control valve has these parts:

 (a)  
The installation of the landing gear door locks
 