27-62-10
ALL ú ú 01 Page 402 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 014-025
(2)
Remove the third center ceiling panel forward of the main entry door No. 1 (AMM 25-59-01/401).
S 024-004
(3)
Remove the switch:
(a)
Remove the forward checknut from the switch.
(b)
Disconnect the electrical wires from the switch.
TASK 27-62-10-404-005
3. Automatic Speed Brake Arm Switch Installation (Fig. 401)_____________________________________________
A. Special Tools and Equipment
(1)
G27018-4 Bushing (Preferred)
(2)
MIT61B04016-35 Part 3 Bushing (optional)
B.
Standard Tools and Equipment
(1)
Ohmmeter or continuity test light
C.
References
(1)
AMM 24-22-00/201, Manual Control
(2)
AMM 25-59-01/401, Main Deck Compartment Cargo Lining Panel
(3)
AMM 29-11-00/201, Main Hydraulic Supply System
(4)
AMM 45-10-00/201, Central Maintenance Computer System
(5)
AIPC 27-62-55, Fig. 1
D.
Access
(1)
Location Zone 211, 212 Passenger Cabin - Nose to First Door
E.
Procedure
S 424-006
(1)
Install the switch:
(a)
Put the switch in its position on the bracket.
(b)
Install the checknut.
(c)
Connect the electrical wires to the switch.
S 834-007
(2)
Adjust the switch with the bushing G27018 or MIT61B04016.
(a)
Move the speed brake lever to the full UP position.
(b)
Move the speed brake lever to the full DOWN position.
(c)
Connect an ohmmeter or a continuity test light across the electrical wires at the switch.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-62-10
ALL ú ú 05 Page 403 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(d)
Move the speed brake lever to the FLIGHT position.
(e)
Install the bushing on the cam roller.
(f)
Move the speed brake lever until the bushing touches the cam ramp.
(g)
Adjust the switch until you get continuity through the switch.
(h)
Remove the bushing from the cam roller.
(i)
Tighten the checknuts on the switch.
S 834-008
(3)
Adjust the switch without the bushing G27018 or MIT61B04016.
(a)
Move the speed brake lever to the full UP position.
(b)
Move the speed brake lever to the full DOWN position.
(c)
Connect an ohmmeter or a continuity test light across the electrical wires at the switch.
(d)
Adjust the switch until you get continuity through the switch.
(e)
Move the switch 0.07 to 0.09 inch (1.78 to 2.29 mm) closer to the striker plate.
(f)
Tighten the checknuts on the switch.
S 864-015
(4)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a)
P7, Overhead Circuit Breaker Panel
1) 7G6, SPEED BRAKE AUTO CONT
F.
Automatic Speed Brake Arm Switch Operational Test
S 864-009
(1)
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).
S 864-011
(2)
Monitor the thrust resolver angle (TRA) on the EICAS EPCS
maintenance display (AMM 45-10-00/201).
S 864-016
(3)
Put the No. 1 and 3 thrust levers in a thrust position of more than 27 degrees (62.7 degrees TRA).
(4)
Put the speed brake lever in the ARMED position.
S 864-017
S 864-024
WARNING: KEEP PERSONS AND EQUIPMENT CLEAR OF THE FLIGHT CONTROL
_______ SURFACES, THE THRUST REVERSERS, AND THE LANDING GEAR. THESE COMPONENTS CAN MOVE SUDDENLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 7(26)