R = REVISED, A = ADDED OR D = DELETED CHAPTER 75 F = FOLDOUT PAGE EFFECTIVE PAGES 17 C PAGE 3 JUL 12/02 LAST PAGE
D6-37537
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
CHAPTER 75 - AIR
TABLE OF CONTENTS
_________________
Chapter Section Subject_______ Subject ____ Effectivity
_______ Page ___________
AIR 75-00-00
___
Description and Operation 1 ALL
General 1
Operation 1
Trouble Shooting 101 ALL
ACCESSORY COOLING 75-20-00
_________________
Description and Operation 1 ALL
General 1
Engine External Accessories 1
Cooling
Engine Internal Cooling 1
High Pressure Turbine Clearance 1
Control System
Turbine Case Cooling 1
ENGINE EXTERNAL ACCESSORIES 75-21-00
COOLING
Description and Operation 1 ALL
General 1
Generator Cooling 1
Ignition Leads Cooling 1
HIGH PRESSURE TURBINE CLEARANCE 75-24-00
CONTROL SYSTEM
Description and Operation 1 ALL
General 1
Valve - High Pressure Turbine 1
Clearance Control
Operation 1
Adjustment/Test 501 ALL
Do The Check For The HPTCC 501
Valve And Timer
TIMER - HIGH PRESSURE TURBINE 75-24-02
CLEARANCE CONTROL
Maintenance Practices 201
(Deactivation)
General 201
HPTCC Timer Deactivation 201
(Electrical Deactivation
Procedure)
[*] ENGINES WITH THE HIGH PRESSURE TURBINE CLEARANCE CONTROL (HPTCC)
TIMER
75-CONTENTS
CBEJ Page 1 Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
CHAPTER 75 - AIR
TABLE OF CONTENTS
_________________
Chapter Section Subject_______ Subject ____ Effectivity
_______ Page ___________
Removal/Installation 401 [*]
[*] ENGINES WITH THE HIGH PRESSURE TURBINE CLEARANCE CONTROL (HPTCC)
TIMER
VALVE - HIGH PRESSURE TURBINE 75-24-01
CLEARANCE CONTROL
Removal/Installation 401 ALL
Inspection/Check 601 ALL
COMPRESSOR CONTROL 75-30-00
__________________ VARIABLE STATOR VANE ACTUATION 75-31-00 SYSTEM
Description and Operation 1 ALL
General 1
Actuator - Variable Stator 1
Vane
Bellcrank - Variable Stator 3
Vane, Assembly
Cable - Feedback, Variable 4
Stator Vane
Rings - Variable Stator Vane 4
Actuation
Operation 4
Maintenance Practices 201 ALL
Actuation Procedure - Engine 204
Motoring
Actuation Procedure - External 201
Pressure Source
Adjustment/Test 501 ALL
Alternate Variable Stator Vane 533
(VSV) Dynamic Rigging
Procedure (With RMS Tool
TEE62-2)
Alternate Variable Stator Vane 539
(VSV) Dynamic Rigging
Procedure (With SPS Tool
SA610)
VSV Dynamic Rigging Procedure 506
(With CFMI Tooling 856A2001
and 856A1214)
VSV Stage to Stage Rigging 501
Procedure
75-CONTENTS
CBEJ Page 2 Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
CHAPTER 75 - AIR
TABLE OF CONTENTS
_________________
Chapter Section Subject_______ Subject ____ Effectivity
_______ Page ___________
ACTUATOR - VARIABLE STATOR VANE 75-31-01 Removal/Installation 401 ALL Inspection/Check 601 ALL
BELLCRANK - VARIABLE STATOR 75-31-03 VANE, ASSEMBLY Removal/Installation 401 ALL CABLE - FEEDBACK, VARIABLE 75-31-02
STATOR VANE Removal/Installation 401 ALL Adjustment/Test 501 ALL Inspection/Check 601 ALL
VARIABLE BLEED VALVE SYSTEM 75-32-00
Description and Operation 1 ALL General 1 Actuator - Bleed Valve and 7
Ballscrew
Actuator - Bleed Valve and 7
Master Ballscrew
Cable - Feedback, Variable 12
Bleed Valve
Mechanism - Stop, Bleed Valve 4
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空气 AIR