• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-08 12:01来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______ REVERSERS. IF YOU DO NOT OBEY THE INSTRUCTIONS WHEN YOU CLOSE THE THRUST REVERSERS, INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
 (6)  
Close the left thrust reverser (AMM 78-31-00/201).

 (7)  
Close the fan cowl panel (AMM 71-11-02/201).


 S 416-010-C00
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-03
 ALL  ú ú C01 Page 602 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
BLEED VALVE AND BALLSCREW ACTUATOR - REMOVAL/INSTALLATION
_________________________________________________________
 1.  General
_______
 A.  This procedure supplies removal and installation instructions for the bleed valve and ballscrew actuators.
 B.  For this procedure the Variable Bleed Valve (VBV) doors will be referred to as VBV doors.
 C.  The installation procedure contains a check of the door position of the bleed valve.
 D.  To get access to the bleed valve and ballscrew actuator you must do the steps that follow:
 (1)
Open the thrust reverser half.

 (2)
Open the fan duct panel.


 E.  The 12 variable bleed valves have there are 11 bleed valve and ballscrew actuators installed on the fan frame.
 F.  The installation procedure is the same for all of the bleed valve and ballscrew actuators.
 TASK 75-32-04-004-001-C00
 2.  Remove the Bleed Valve and Ballscrew Actuator
_____________________________________________
 A.  References
 (1)
AMM 72-33-03/401, Fan Duct Panels

 (2)
AMM 78-31-00/201, Thrust Reverser System


 B.  Access
 (1)  
Location Zones
 506 Engine No. 1 - Fan Frame
 606 Engine No. 2 - Fan Frame


 (2)  
Access Panels 5739L/5783L Thrust Reverser Half - Engine No. 1 5839R/5838R Thrust Reverser Half - Engine No. 2


 C.  Procedure (Fig. 401)
 S 014-002-C00
 (1) Open the applicable thrust reverser half (AMM 78-31-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-04
 ALL  ú ú C01 Page 401 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
SEE A
SEE B(11 LOCATIONS)
FWD
A
Bleed Valve and Ballscrew Actuator Installation Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-04
 ALL  ú ú C01 Page 402 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
HOOK
SEE C
A
BLEED VALVE AND BALLSCREW ACTUATOR
A  DOOR HOLES SETTING YOKE 
YOKE END  PUSHER  B  YOKE END  PROTECTING BOOT  SHAFT VBV DRIVE 
CAPTIVE BOLTS UPPER HORIZONTAL  BLEED VALVE DOOR
LOWER VERTICAL CAPTIVE BOLTS  SEAL 

SETTING YOKE 

YOKE END
VBV DOOR PUSHER
MAX. CLEARANCE:
0.02 INCH (0.5 MM)
FAN FRAME
A-A  S-M56-MM-1008-(1)-00-B
Bleed Valve and Ballscrew Actuator Installation
Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-04
 ALL  ú ú C01 Page 403 ú Mar 15/89
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空气 AIR(105)