75-31-02
ALL ú ú C01 Page 517 ú Mar 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
___________VSV'S IN THE FULLY OPEN
CORRECT RIG: POSITION WITH THE CORRECT VSV CABLE RIG.
_____________ VSV'S IN THE FULLY OPEN
INCORRECT RIG: POSITION WITH THE CABLE NOT RIGGED CORRECTLY (THIS MISADJUSTMENT WILL CAUSE THE VSV'S TO TRACK ON THE CLOSED SIDE OF THE VSV SCHEDULE).
_____________ VSV'S IN THE FULLY OPEN
INCORRECT RIG: POSITION WITH THE CABLE NOT RIGGED CORRECTLY (THIS MISADJUSTMENT WILL CAUSE THE VSV'S TO TRACK ON THE OPEN SIDE OF THE VSV SCHEDULE).
Variable Stator Vane (VSV) Feedback Cable Static Rig Check
Figure 504 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-31-02
ALL ú ú C01 Page 518 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
S 725-027-C00
CAUTION: MAKE SURE THERE IS CLEARANCE BETWEEN THE PARTS THAT FOLLOW:
_______
-
THE FEEDBACK CABLE ROD FOR THE VSV
-
THE ROD END/HEAD END HOSES FOR THE VSV
-
THE ATTACHED HARDWARE.
NO CLEARANCE BETWEEN THE PARTS CAN CAUSE THE VSV TO OPERATE OFF
SCHEDULE.
(3) Do a check for clearance between the parts that follow:
(a)
The feedback cable rod for the VSV
(b)
The rod end/head end hoses for the VSV
(c)
The attached hardware.
S 825-028-C00
(4)
If it is necessary, adjust the position of the hoses to get clearance.
S 725-029-C00
(5)
Apply a tension load of 15-17 pounds (67-76 N) in a line with cable centerline axis.
S 725-030-C00
(6)
Keep the load and do a check that the rig pointer is aligned with the notch for the rig plate.
S 825-031-C00
(7)
If the rig pointer and the rig plate notch are not aligned, align the rig pointer with the rig plate notch as follows:
(a)
Loosen the locking bolt on the feedback cable adjustment bracket.
(b)
Turn the adjustment screw to align the rig pointer to the rig plate notch.
(c)
Tighten the locking bolt to 32-35 pound-inches
(3.6-4.0 Newton meters).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-31-02
ALL ú ú C02 Page 519 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
S 415-054-C00 WARNING: OBEY THE INSTRUCTIONS IN THE PROCEDURE TO CLOSE THE THRUST
_______ REVERSER. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
(8) Close the left thrust reverser half (AMM 78-31-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-31-02
ALL ú ú C02 Page 520 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
VARIABLE STATOR VANE FEEDBACK CABLE - INSPECTION/CHECK
______________________________________________________
1. General
_______
A. An inspection of the feedback cable of the variable stator vane (VSV) includes a visual check for wear, correct installation, and if it is attached correctly.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空气 AIR(70)