• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-08 12:01来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
S 014-003-C00
 (2)  Remove the applicable fan duct panel (AMM 72-33-03/401).
 S 344-025-C00
 CAUTION: MAKE SURE THAT THE BLEED VALVE DOORS ARE ALMOST CLOSED.
_______
 (3)  Disengage and remove the flexible shafts from each side of the ballscrew actuator.
 (a)  
Compress the spring hexagonal end of the flexible shaft.

 (b)  
Disengage the 8-point fitting at the opposite end.


 S 034-005-C00
 (4)  
Loosen the four captive bolts that attach the bleed valve and ballscrew actuator to the fan frame.

 S 024-006-C00

 (5)  
Remove the actuator from the engine.


 TASK 75-32-04-404-007-C00
 3. Install the Bleed Valve and Ballscrew Actuator
______________________________________________
 A. Equipment
 (1)  
856A2501 - Wrench, Ratchet, Dual Purpose - VBV Manual Actuation, CFM International, P.O. Box 15514, Cincinnati, OH 45215

 (2)  
856A3368 - Yoke, Setting - VBV Doors, CFM International

 (3)  
856A3408 - Gage, Master - VBV Door Setting Yoke, CFM International


 B. References
 (1)  
AMM 72-33-02/401, Fan Duct Panels

 (2)  
AMM 75-32-00/201, Variable Bleed Valve System

 (3)  
AMM 78-31-00/201, Thrust Reverser System


 C. Access
 (1)  
Location Zones
 506 Engine No. 1 - Fan Frame
 606 Engine No. 2 - Fan Frame


 (2)  
Access Panels 5739L/5783L Thrust Reverser Half - Engine No. 1 5839R/5838R Thrust Reverser Half - Engine No. 2


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-04
 ALL  ú ú C02 Page 404 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
D.  Install the bleed valve and ballscrew actuator
 S 724-008-C00
 (1)  Do a check that the translating nut in the bleed valve and ballscrew actuator moves freely.
 (a)  
Operate the ballscrew actuator with the VBV drive shaft.

 (b)  
Use the dual purpose ratchet wrench.


 S 864-009-C00
 (2)  
Put the bleed valve near the closed position.

 S 424-010-C00

 (3)  
Put the bleed valve and ballscrew actuator in its location on the fan frame.

 S 434-011-C00

 (4)  
Tighten, by hand, the four captive bolts that attach the bleed valve and ballscrew actuator to the fan frame.


 NOTE: Do not lubricate the bolt threads.
____
 S 214-012-C00
 (5)  
Do a check that the VBV door is correctly in the center of the fan frame seat.

 S 434-013-C00

 (6)  
Tighten the two vertical bolts to 105-115 pound-inches
 (11.9-13.0 Newton meters).


 S 434-026-C00

 (7)  
Tighten the two horizontal bolts to 70-90 pound-inches
 (8-10.0 Newton meters).


 S 434-028-C00

 (8)  
ENGINES PRE-CFMI-SB 72-580; Do a check of the position of the bleed valve door (Fig. 401, Sheet 2)


 (a)  Install the setting yoke on the bleed valve door as follows:
 1)  Before you install the setting yoke, use the master gage to make sure that the yoke is set correctly. a) If it is not set correcly, adjust it.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-04
 ALL  ú ú C01 Page 405 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
2)  Put the yoke trunnions in the door holes.
 3)  Attach the hook on the bleed valve housing.
 (b)  Disengage the main flexible shaft.
 (c)  Turn the VBV control drive of the bleed valve and master
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空气 AIR(106)