(e)  Do a check for overlap of the centerline of the rod end bearing of the cable with the centerline of the cable attachment hole of the MEC feedback arm cable. 1) If there is no overlap, make the cable longer.
 NOTE: To do this, loosen the jamnut and turn the rod end
____
 bearing.

 S 865-012-C00
 (5)  Operate the VBV system to the full open position (AMM 75-32-00/201).
 (a)  
Attach a pull scale to the rod end bearing.

 (b)  
Apply a tension load of 15-17 pounds (67-76 N) in a line with the cable centerline axis.

 (c)  
Keep the load while you push the MEC feedback arm away from the cable attachment bracket.

 (d)  
Do a check for clearance between the centerline of the rod end bearing of the cable and the centerline of the cable attachment hole of the MEC feedback arm.

 (e)  
If there is no clearance, make the cable shorter.


 NOTE: To do this, loosen the jamnut and turn the rod end
____
 bearing.

 (f)  Do a check that the threads are engaged sufficiently.
 NOTE: To do this, make sure a 0.032 inch (0.80 mm) diameter
____ lockwire does not go through the witness hole.
 1)  If the threads are not correctly engaged, adjust the cable length.
 NOTE: To do this, turn the rod end bearing.
____
 2)  If the threads are not correctly engaged, do the steps to do the clearance check of the MEC feedback arm in the above steps.
 (g)  
If an adjustment of the rod end bearing was necessary, do the step that follows: 1) Tighten the jamnut against the rod end bearing to

 60-70 pound-inches (6.8-7.9 Newton meters).

 (h)  
Attach the rod end bearing to the MEC feedback arm. 1) Align the rod end bearing with the MEC feedback arm and


 install the pin. 2) Install the retainer clip and the fillister head screw. 3) Tighten the screw to 24-27 pound-inches
 (2.7-3.1 Newton meters).
 H.  Do the Static Rig Check (Fig. 504)
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-05
 ALL  ú ú C01 Page 514 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
SEE  A 
APPLY TENSION  SEE  B 
PULL SCALE 
SEE  LOCKWIRE C  ALIGNMENT BAR TO THE MEC FEEDBACK ARM
RIG NOTCH  MEC  LOCKING BOLT  CABLE ADJUSTMENT BRACKET  ADJUSTMENT SCREW 

CABLE G-M56-MM-0168(1)-00-B ATTACHMENT BRACKET
CLOSED VBV POSITION
B
Variable Bleed Valve (VBV) Feedback Cable Static Rig Check Figure 504 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-05
 ALL  ú ú C01 Page 515 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
RIG NOTCH

CORRECT RIG: VBV'S IN THE FULLY CLOSED POSITION WITH THE CORRECT CABLE RIG. ALIGNMENT BAR
RIG NOTCH

INCORRECT RIG: VBV'S IN THE FULLY CLOSED POSITION WITH THE CABLE NOT RIGGED CORRECTLY (THIS MISADJUSTMENT WILL CAUSE THE VBV'S TO TRACK ON THE OPEN SIDE OF THE VBV SCHEDULE).

ALIGNMENT BAR
RIG NOTCH

INCORRECT RIG: VBV'S IN THE FULLY CLOSED POSITION WITH THE CABLE NOT RIGGED CORRECTLY (THIS MISADJUSTMENT WILL CAUSE THE VBV'S TO TRACK ON THE CLOSED SIDE OF THE VBV SCHEDULE).

ALIGNMENT BAR G-M56-MM-0184(1)-00-B

Variable Bleed Valve (VBV) Feedback Cable Static Rig Check Figure 504 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-32-05
 ALL  ú ú C01 Page 516 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
 