• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:37来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

ELECTRICAL (PRE-SB 21123) CONNECTOR
TORQUE SHAFT QUADRANT
SEE F
RIGGING PIN (5/16-INCH DIAMETER)
TURNBUCKLES
RAMB (CABLE B)
INBD
CONTROL CABLE GUARD RAMC (CABLE C)
FWD
RAMA (CABLE A)
RAM AIR ACTUATOR AND LINKAGE SYSTEM
B
Ram Air Inlet Control Cables Adjustment Figure 501 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-52-81
 ALL  ú ú 01 Page 506 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500MAINTENANCE MANUAL
DEFLECTOR DOOR
MODULATION INLET MODULATION
DOOR SHAFT PANEL QUADRANT
SUPPORT ASSEMBLY
FWD  RIGGING PIN (5/16-INCH ACCESS PANEL DIAMETER)
INSTALL SHOP AID INBD IF NECESSARY
SEE D
INLET MODULATION PANEL AND DEFLECTOR DOOR
DUCT  C  WHEEL  0.25 INCH (7.62 0.30 mm) 6.35 8.89 0.35  (6.731 6.858 INCH0.265 mm) 6.731 0.270 0.265 
CLAMP  WELL WEB 
FLEXIBLE 
DUCT  ARM 
SHOP AID:  FULL RADIUS 
MAKE FROM 
BACB30NF 7-17 
COVER 

PIN HOLE FOR RIGGING PIN (1/4-INCH DIAMETER)
INBD
TORQUE SHAFT
LOUVER ASSEMBLY
FWD
RAM AIR EXHAUST LOUVER ASSEMBLY E1
Ram Air Inlet Control Cables Adjustment Figure 501 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-52-81
 ALL  ú ú 01 Page 507 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
RIG PIN HOLE FOR FLIGHT OPEN POSITION
RIG PIN HOLE FOR
FULL (GROUND)
OPEN POSITION
(5/16-INCH DIAMETER)

TORQUE SHAFT QUADRANT
F

Ram Air Inlet Control Cables Adjustment

Figure 501 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-52-81
 ALL  ú ú 01 Page 508 ú Mar 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
H22857
A 737-300/400/500MAINTENANCE MANUAL
FITTING 2
FITTING 1

CABLE C

REF CABLE  MB - CLOSED MA - OPEN FUNCTION  NO. DRAWING  REQ NO.  L2L1 (INCHES) LENGTH  SIZE CABLE  FITTINGS 
1  2  3 
A  RAMA  69-41215-1  2  137.90  3/32 7x7  BACT14A3  MS21260-L3LH  ----
B  RAMB  69-41215-1  2  137.90  3/32 7x7  BACT14A3  MS21260-L3LH  ----
C  RAMC  69-69425-1  2  19.5  9.7 3/32 7x7  MS21260-L3RH  MS21260-L3RH  BACT14B3

CODE CABLE  FUNCTION 
RAMA  ACTUATOR RETRACTED 
QUADRANT CLOCKWISE 
INLET OPEN 
RAMB  ACTUATOR EXTENDED 
QUADRANT COUNTER-
CLOCKWISE INLET CLOSED 

CHART PANEL CONTROL CABLE TENSION RAM AIR INLET MODULATION 
TEMP `F AMBIENT  LOAD |5 LBS CABLE RIGGING 
110  88 
90  79 
70 70 
50 61 
30 52 
10 42 
-10 33 
-30  24 
-40  19 

Ram Air Inlet Control Cables Adjustment
Figure 501 (Sheet 4)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-52-81
 ALL  ú ú 01 Page 509 ú Mar 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
H22871
A
737-300/400/500MAINTENANCE MANUAL
 RAM AIR EXHAUST MODULATION LOUVER ASSEMBLY - REMOVAL/INSTALLATION
_________________________________________________________________
 1.  General
_______
 A.  This procedure has two tasks. The first task is the removal of the ram air exhaust modulation louver assembly. The second task is the installation of the ram air exhaust modulation louver assembly.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 2(71)