 S 085-045

 (2)  
Remove the test equipment from the airplane.

 S 415-046

 (3)  
Push the modules forward on the main instrument panel and engage the fasteners.

 S 415-047

 (4)
Install the Control Display Units (CDUs) of the Flight Management Computer System (FMCS), on the P9 panel (AMM 34-62-11/401).

 (5)  
Close the P6-2 circuit breaker panel.

 S 865-048

 (6)  
Remove the electrical power if it is not necessary
 (AMM 24-22-00/201).

 

 S 415-049
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 21-58-03
 ú ú 04 Page 514 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 EQUIPMENT COOLING BLOWER - REMOVAL/INSTALLATION
_______________________________________________
 1.  General_______
 A.  This procedure has two tasks. The first task is the removal of the equipment cooling blowers. The second task is the installation of the equipment cooling blowers.
 B.  AIRPLANES WITH A SEPARATELY INSTALLED CHECK VALVE FOR EACH BLOWER; There are two equipment cooling blowers: the main blower and the alternate blower. The blowers are adjacent to each other. A separate check valve is downstream of each blower.
 C.  AIRPLANES WITHOUT A SEPARATELY INSTALLED CHECK VALVE FOR EACH BLOWER; There are two equipment cooling blowers: the main blower and the alternate blower. The blowers are adjacent to each other. Each blower has an integral check valve downstream of the air flow.
 D.  The removal and the installation of each blower is the same.
 TASK 21-58-12-004-003
 2.  Equipment Cooling Blower Removal (Fig. 401)________________________________
 A.  References
 (1)  24-22-00/201, Manual Control
 B.  Access
 (1)  Location Zone
 205 Electronic Compartment

 C.  Procedure
 S 864-017
 (1)  
Remove electrical power (AMM 24-22-00/201).

 S 014-001

 (2)  
Get access to the blower:

 (a)  
Remove the oxygen bottle shroud.

 (b)  
Remove the forward right bulkhead panel in the forward cargo compartment.

 


 S 024-021
 (3)  AIRPLANES WITH A SEPARATELY INSTALLED CHECK VALVE FOR EACH BLOWER; Remove the blower (Fig. 401):
 (a)  Loosen the five duct clamps that attach the flexible duct to the blower, the check valve, and the ducts.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-58-12
 ALL  ú ú 10 Page 401 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL 
BULKHEAD PANEL 
COMPARTMENT EQUIPMENT ELECTRONIC  COOLING EQUIPMENT BLOWERS ASEE SHROUD OXYGEN BOTTLE 
BLOWER ALTERNATE 
DUCT 
MAIN BLOWER  CONNECTORS ELECTRICAL  FORWARD BULKHEAD 
EACH BLOWER) (5 LOCATIONS CLAMP 
FLEXIBLE DUCT  CLAMP (2 LOCATIONS (BELOW THE FLEXIBLE DUCT, EACH BLOWER) CHECK VALVE STRUCTURAL SUPPORT EACH BLOWER) EQUIPMENT COOLING BLOWERS A  FWD 
Equipment Cooling Blower Installation Figure 401 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH A SEPARATELY INSTALLED ú

 21-58-12
 CHECK VALVE FOR EACH BLOWER  ú ú 03 Page 402 ú Nov 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL


Equipment Cooling Blower Installation
Figure 401A

E33042
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù.
 