EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-61
ALL ú ú 01 Page 404 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
PACK VALVE - REMOVAL/INSTALLATION
_________________________________
1. General_______
A. The pack valves stop or let in the flow of air from the pneumatic manifold to the air conditioning system.
B. The pack valves are in the left and the right equipment bay for the air conditioning.
TASK 21-51-71-004-001
2. Remove the Pack Valve (Fig. 401)_____________________
A. Access
(1) Location Zones
212 Left Air Conditioning Bay
214 Right Air Conditioning Bay
B. Prepare for the Removal
S 014-002
(1) Open the equipment bay access door for the air conditioning.
C. Procedure
S 034-029
(1)
Remove the duct clamps and disconnect the support clamp of the hot air duct that is forward of the mixture valve.
S 024-006
(2)
Remove the hot air duct.
S 034-007
(3)
Disconnect the electrical connectors and the bounding jumper from the valve.
S 034-008
(4)
Disconnect the sense line for the cabin pressure at the pack valve.
(5)
Remove the aft and the forward clamp from the valve.
S 024-010
(6)
Remove the valve.
S 034-009
(a) Move it straight down.
TASK 21-51-71-404-011
3. Install the Pack Valve (Fig. 401)______________________
A. References
(1) AMM 21-51-00/501, Air Cycle System
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-71
ALL ú ú 02 Page 401 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500
MAINTENANCE MANUAL
PACK VALVE SEE B
SEE A EQUIPMENT BAY AIR CONDITIONING FWD BSEE A PACK VALVE AIR CONDITIONING EQUIPMENT BAY
FLOW DIRECTION
(2 LOCATIONS) CLAMP
TEST PORT (2 LOCATIONS)
CABIN PRESSURE PORT CONNECTION
Figure 401 Pack Valve Installation B PACK VALVE ELECTRICAL (3 LOCATIONS) CONNECTOR
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-71
ALL ú ú 02 Page 402 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
B.
C.
D.
A
737-300/400/500MAINTENANCE MANUAL
(2)
AMM 24-22-00/201, Manual Control
(3)
AMM 36-05-00/201, Pneumatic SystemAccess
(1)
Location Zones 212 Left Air Conditioning Bay 214 Right Air Conditioning Bay
Procedure
S 984-012
(1)
Put the valve into its position with the arrow in the aft direction.
S 434-013
(2)
Install but do not tighten the forward clamp on the valve.
S 984-014
(3)
Turn the valve as necessary to align it with the sense line for the cabin pressure and to give clear access to the test ports.
(a) You can move the heat detector wire if it is necessary.
S 434-015
(4)
Install but do not tighten the aft clamp on the valve.
S 984-016
(5)
Turn the forward clamp as necessary to let you tighten the clamp nut from the outboard side.
S 434-017
(6)
Connect the sense line for the cabin pressure.
S 434-018
(7)
Tighten the forward and the aft clamps.
S 434-019
(8)
Connect the electrical connectors and the bonding jumper.
S 984-020
(9) 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 2(36)