EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-52-71
ALL ú ú 01.1 Page 403 ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(k) Put the air conditioning PACK switch in the OFF position.
1) Make sure the turbofan valve closes.
ú a) Do a check that high velocity warm air no longer flows
ú from the ram air exhaust duct.
F. Put the Airplane Back to Its Usual Condition
S 864-010
(1) Put the ISOLATION VALVE switch in the CLOSE position.
S 864-009
(2) Remove the pneumatic system pressure if it is not necessary
(Ref 36-05-00/201).
S 864-011
(3) Remove the electrical power if it is not necessary
(Ref 24-22-00/201).
S 414-012
(4) Close the applicable A/C access panel 3304 or 3404.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-52-71
ALL ú ú 01.1 Page 404 ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
RAM AIR DUCTACCESS DOOR
SEE B
EQUIPMENT BAY DOORS SEE A
SEE C
CLAMP ELECTRICAL
CONNECTOR FWD
A
CLAMP
TURBOFAN
VALVE
ELECTRICAL CONNECTORFWD
BONDING
BONDING JUMPER
JUMPER INBD
ELECTRICAL CONNECTOR
ELECTRICAL
CONNECTOR
RIGHT TURBOFAN VALVE
CLAMP
B TURBOFAN VALVE
INBD FWD
LEFT TURBOFAN VALVE
C
Turbofan Valve Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-52-71
ALL ú ú 01 Page 405 ú Mar 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
RAM AIR INLET CONTROL CABLES - ADJUSTMENT/TEST
______________________________________________
1. General_______
A. There are two tasks in this procedure:
(1)
Ram Air Inlet Control Cables - Adjustment
(2)
Ram Air Modulation System - Operational Test
B. The adjustment procedure is applicable to the control cables on the left or right side. You can adjust the left side cables and the right side cables at the same time.
C. The operational test makes sure that the modulation system operates correctly after the control cables have been adjusted.
TASK 21-52-81-825-001
2. Ram Air Inlet Control Cables - Adjustment_________________________________________
A. Special Tools and Equipment
(1)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 2(68)