 TASK 21-51-41-107-001
 2. Clean the Water Separator Coalescer (Bag)
_________________________________________
 A. Equipment
 (1)  Washing Machine
 B. Consumable Materials
 (1)  
B00541 General purpose detergent

 (2)  
B00074 Dry cleaning solvent, P-D-680 or equivalent


 NOTE: Use the dry cleaning solvent only when the bag has oil or
____
 grease contamination.

 C. References
 (1)  AMM 21-51-41/401, Water Separator Coalescer (Bag)
 D. Access
 (1)  Location Zones
 212 Left Air Conditioning Bay
 214 Right Air Conditioning Bay

 E. Procedure
 S 027-002
 (1)
Remove the bag from the water separator (AMM 21-51-41/401).

 S 217-003

 (2)  
Examine the bag for oil or grease contamination.

 S 117-007

 (3)  
Clean the bag if it has oil or grease contamination:

 (a)  
Put the bag fully in the cleaning solvent.

 (b)  
Carefully rub the bag where it has the contamination, then remove the bag from the solvent.

 


 S 167-004
 (4)  
Put the bag in the washer with the water and the fabric detergent and wash the bag for one normal cycle.

 S 287-005

 (5)  
If you used the cleaning solvent, make sure you can not smell any of the solvent.

 (a)  If you can smell any of the solvent, wash the bag for another cycle.

 (6)  
Install the bag (AMM 21-51-41/401).


 S 427-006
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-41
 ALL  ú ú 02 Page 701 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 35°F CONTROL VALVE - REMOVAL/INSTALLATION
_________________________________________
 1.  General_______
 A.  Each air cycle system has a 35°F control valve.
 B.  The removal/installation steps are almost the same for the left and the right valve.
 TASK 21-51-51-004-024
 2.  Remove the 35°F Control Valve (Fig. 401)_____________________________
 A.  Access
 (1)  Location Zones
 212 Left Air Conditioning Equipment Bay
 214 Right Air Conditioning Equipment Bay

 B.  Procedure
 S 014-002
 (1)
Lower the applicable equipment bay door for the air conditioning.

 S 034-001

 (2)
Disconnect the electrical connector from the valve.

 S 034-003

 (3)
Disconnect the bonding jumper from the valve.

 S 034-005

 (4)
Remove the V-band clamps that hold the valve in place.

 S 024-004

 (5)
Remove the valve.


 TASK 21-51-51-404-006
 3.  Install the 35°F Control Valve (Fig. 401)______________________________
 A.  References
 (1) 24-22-00/201, Electrical Power
 B.  Access
 (1)  Location Zones
 212 Left Air Conditioning Equipment Bay
 214 Right Air Conditioning Equipment Bay

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-51
 ALL  ú ú 02 Page 401 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

AIR CONDITIONING  AIR CYCLE
EQUIPMENT BAY  MACHINE 
SEE  A  SEE  B 

FWD
AIR CONDITIONING EQUIPMENT BAY
35`F CONTROL  A 
VALVE 
POSITION INDICATOR  ELECTRICAL CONNECTOR 
BONDING 
JUMPER 

TO WATER SEPARATOR
FWD
V-BAND CLAMPS INBD
WATER SEPARATOR MUFF
AIR CYCLE MACHINE
AIR CYCLE MACHINE
B
NOTE: LEFT INSTALLATION IS SHOWN. RIGHT INSTALLATION IS ALMOST THE SAME.
35`F Control Valve Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 2(32)