S 844-021
(2)
If the gasket is damaged, do these steps to replace the gasket:
(a) Remove the gasket and all adhesive with a putty knife or similar tool that has a medium sharp edge.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-21
ALL ú ú 03 Page 403 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(b)
Use methyl ethyl ketone, isopropyl alcohol, or ethyl alcohol to remove all of the remaining adhesive.
(c)
Do these steps to install a gasket that does not already have adhesive applied: 1) Apply a large quantity of the primer on the surfaces to be
bonded. 2) Let the primer dry for a minimum of 30-minutes. 3) Apply a constant layer of the adhesive. 4) Attach the surfaces as soon as it is possible after you
apply the adhesive.
NOTE: Apply sufficient pressure to make sure the
____ surfaces touch fully. Do not apply pressure that pushes the adhesive out from the surfaces.
5) Let the installation dry for 24 hours at 70 to 80°F or 45 to 60 minutes at 200 to 250-F.
(d) Do these steps to install a gasket that already has adhesive applied: 1) Remove the tape from the gasket. 2) Install the gasket on the heat exchanger.
NOTE: Make sure the heat exchanger surface is clean
____ and flat before you install the gasket.
E. Install the heat exchanger.
S 424-022
(1)
Put the heat exchanger in its position.
S 434-027
(2)
Hold the heat exchanger while you install the fasteners on the inboard side of the heat exchanger:
(a) For the primary heat exchanger, install the bolts and washers that attach the heat exchanger to the two clip assemblies and to the outlet duct for the ram air.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-21
ALL ú ú 01 Page 404 ú Mar 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SECONDARY HEAT
EXCHANGER
SEE B THE RAM AIR INLET DUCT FOR
RAM AIR DUCT ACCESS DOOR EQUIPMENT BAY DOORS FOR THE INLET DUCT INSPECTION DOORS OF THE RAM AIR
PRIMARY HEAT
EXCHANGER
FWD PRIMARY HEAT EXCHANGER SECONDARY HEAT EXCHANGER HEAT EXCHANGER THE PRIMARY INLET DUCT TO SEE A THE TURBOFAN DRIVE DUCT ASSEMBLY TO DUCT BETWEEN THE PRIMARY HEAT EXCHANGER AND THE MIX VALVE
AIR CONDITIONING EQUIPMENT BAYS
THE TURBOFAN DRIVE DUCT ASSEMBLY TO
RAM AIR DUCT
STIFFENING FLANGE
SECONDARY HEAT EXCHANGER
PRIMARY HEAT EXCHANGER AIR CLEANER PURGE LINE FOR THE A FWD
Heat Exchanger Installation Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-21
ALL ú ú 01 Page 405 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
INLET LIP TO THE HEAT EXCHANGER
SEE C
SUPPORT ROD FOR INLET DUCT FORTHE HEAT EXCHANGER THE RAM AIR
SEE D
OUTLET DUCT FOR
THE RAM AIR
FLEXIBLE HEAT
DUCT EXCHANGER
GASKET
SECONDARY HEAT SEE C
EXCHANGER
STIFFENING
FLANGES
PRIMARY HEAT
FWD EXCHANGER
B
SUPPORT ROD FOR
LOWER WING BEAMTHE HEAT EXCHANGER GASKET (EXAMPLE, 4 LOCATIONS)INLET LIP TO THE HEAT EXCHANGER CLIP ASSEMBLY FOR THE SUPPORT ROD LOCKNUTS
HEAT
EXCHANGER
INLET
AIR
GASKET
CONDITIONING DUCT
SPACERS
FLEXIBLE DUCT
HEAT
EXCHANGER
FWD FWD STIFFENING FLANGES
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 2(20)