• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 05:51来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)  
WDM 28-21-01


 C. Access
 (1)  
Location Zones
 101 Control Cabin Left
 102 Control Cabin Right
 303 Left Wing Inboard Leading Edge
 403 Right Wing Inboard Leading Edge


 (2)  
Access Panels
 6212 Access Door (left side)
 6512 Access Door (right side)

 

 D. Prepare for the Test
 S 865-002
 (1)  
Connect the external electrical power to the airplane (AMM 24-22-00/201).

 S 015-003

 (2)  
Open one of these two access doors to get access to the applicable engine shutoff valve:

 (a)  
The access door, 6212, for the engine shutoff valve (on the left side immediately outboard of the engine)

 (b)  
The access door, 6512, for the engine shutoff valve (on the right side immediately outboard of the engine)

 


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-00
 ALL  ú ú 02 Page 501 ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 S 865-004
 (3)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P6 Main Power Distribution Panel
 1) SHUTOFF VALVE ENG 1
 2) SHUTOFF VALVE ENG 2
 3) INDICATOR MASTER DIM BUS
 4) ENGINE NO. 1 RIGHT IGNITION
 5) ENGINE NO. 1 LEFT IGNITION
 6) ENGINE NO. 2 LEFT IGNITION
 7) ENGINE NO. 2 RIGHT IGNITION

 S 865-006
 (4)  
Make sure the engine start levers on the aisle stand are in the CUTOFF position.

 S 865-007

 (5)  
Set the BAT switch on the P5 panel to the ON position.


 E. Test Procedure
 S 715-242
 (1)  Do these steps to do a check of the redundant wiring path to close each shutoff valve (WDM 28-21-01):
 (a)  To do a test of the wiring for the No. 1 Engine shutoff valve, do these steps: 1) Disconnect connector D4182. 2) With connector D4182 disconnected, do a continuity check
 from D4182P, pin 8 to D4182J, pin 8.
 NOTE: This is a check to make sure the redundant wire
____ path from splice SM36 to splice SP3018 does not have a problem (WDM 28-21-01).
 3) Re-connect connector D4182.
 (b)  To do a test of the wiring for the No. 2 Engine shutoff valve, disconnect connector D4184. 1) Disconnect connector D4184. 2) With connector D4184 disconnected, do a continuity check
 from D4184P, pin 16 to D4184J, pin 16.
 NOTE: This is a check to make sure the redundant wire
____ path from splice SM10 to splice SP3016 does not have a problem (WDM 28-21-01).
 3) Re-connect connector D4184.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-00
 ALL  ú ú 01 Page 502 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 S 865-243
 (2)  Close these circuit breakers and remove the DO-NOT-CLOSE tags:
 (a)  P6 Main Power Distribution Panel
 1) SHUTOFF VALVE ENG 1
 2) SHUTOFF VALVE ENG 2
 3) INDICATOR MASTER DIM BUS

 S 715-008
 (3)  Make sure the position indication lights for the engine shutoff valve operate correctly (Fig. 501).
 (a)  
Find the position indication lights on the P5 panel.

 (b)  
Push the position indication lights to make sure they come on and make sure they are bright blue.


 NOTE: The position indication lights are press-to-test lights.
____
 S 715-009
 (4)  Examine the position indication lights for each of the two engine shutoff valves.
 (a)  Make sure the two engine shutoff valves are fully closed.
 S 715-010
 (5)  Make sure the engine shutoff valve operates correctly with the start lever for the applicable engine (Fig. 501).
 (a)  
Move the start lever for the applicable engine forward 1.8 inches from the CUTOFF position.

 (b)  
Make sure the applicable position indication light is on brightly while the position of the engine shutoff valve changes.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 燃油 FUEL 2(77)