• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 05:51来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-12
 ALL  ú ú 02 Page 401 ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
REVERSE THRUST LEVER
CONTROL LINK
ENGINE START LEVERS
SEE A
FUEL SHUTOFF VALVE SWITCHES
SEE B
ENGINE START LEVER-ACTUATED SWITCHES ACCESS PANEL
PILOT'S CONTROL STAND
IGNITION START LEVERSSWITCHES FWD
START DRUMS
ENGINE START LEVERS
SWITCH
A
SHIM ACTUATING
(2 LOCATIONS) CAMS

SPACER
(2 LOCATIONS)

ACTUATOR
(2 LOCATIONS)

FUEL SHUTOFF
VALVE SWITCH
(2 LOCATIONS)

TERMINAL
SCREWS

WASHER (2 LOCATIONS)
FWD SCREW (2 LOCATIONS)
FUEL SHUTOFF VALVE SWITCHES
B
Engine Fuel Shutoff Valve Switch Installation
Figure 401

FORWARD THRUST LEVER
THRUST DRUM
START
LEVER

SWITCH ACTUATING CAMS
START
DRUM

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-12
 ALL  ú ú 01 Page 402 ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 034-006
 (5)  Remove the two mounting screws and washers from the left side of the control stand to remove the two switches, two roller actuators, two block spacers and two shims.
 NOTE: The two screws extend through the left bracket, switches,
____ actuators, spacers and shims to engage nutplates in the right bracket.
 (a)  
Keep the shims for the installation.

 (b)  
Keep the mounting screws and use them to install the switch again if the mounting screws are in a good condition.


 TASK 28-22-12-404-007
 3. Engine Fuel Shutoff Valve Switch Installation (Fig. 401)
_____________________________________________
 A. References
 (1)  
AMM 28-22-12/501, Engine Fuel Shutoff Valve Switch

 (2)  
WDM 28-21-01, Engine Fuel Shutoff Valves


 B. Access
 (1)  Location Zones
 101 Control Cabin Left
 102 Control Cabin Right

 C. Procedure
 S 434-009
 (1)  Install the two switches, two roller actuators, two block spacers and two shims with the two mounting screws and washers as follows:
 (a)  
Install the washers on the screws.

 (b)  
Push the screws through the left bracket and the left switch and roller actuator.

 (c)  
Push the screws through the left block spacer and shim.

 (d)  
Push the screws through the right switch and roller actuator.

 (e)  
Push the screws through the right block spacer and shim; engage the screws in the nutplates on the right bracket and tighten.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-22-12
 ALL  ú ú 02 Page 403 ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (2)  S 224-016Do a check of the clearance between the head of the rivet that holds the roller on the actuator with the edge of the start drum; there must be a minimum clearance of 0.05 inch (1.27 millimeters). (a) If the clearance is less than 0.05 inch (1.27 millimeters), remove the old shims and install new shims; peel the shims to get the correct clearance.
 (3)  S 434-010Connect the three wires to the switch and tighten the terminal screws (WDM 28-21-01).
 NOTE:____ The terminal screws on the bottom of the switch are marked to show common (C), open (NO), and closed (NC).
 (a)  Remove the tape from the wires.
 (4)  S 714-012Do the task: Fuel Shutoff Valve Switch Adjustment/Test (AMM 28-22-12/501).
 (5)  S 414-013Install the bottom and top access panel on each side of the pilot's control stand.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 燃油 FUEL 2(109)