Main Landing Gear Beam Hanger Shaft Installation 
Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-32-93
 ALL  ú ú 01 Page 402 ú Nov 12/99 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
737-300/400/500MAINTENANCE MANUAL 
15.
 BEAM HANGER
16.
 SPACER  16. SPACER 2
18. STUD  ASSEMBLY 
4. BEAM HANGER SHAFT 
1 
0.001-0.135 INCH 0.016-0.060 INCH 
5 6
A-A3 
15. BEAM HANGER
18. STUD  ASSEMBLY 
2 
4. BEAM HANGER 
 SHAFT
1 
0.01-0.110 INCH
A-A 4 
OUTER WING 
10. STABILIZING
DOOR HINGE BEAM 
BRACKET ON 
11. TRUNNION 
STRUCTURE 
LINK 
12. OUTER WING  DOOR PUSHROD
BRACKET ON 
STRUCTURE
14. OUTER
SEEF 
WING DOOR 
13. BONDING 9. WING DOOR CABLE FWD HINGE BOLT 10. STABILIZING 
E 
BEAM 
1 THE BEAM HANGER SHAFT  4 FOR 737-400 AIRPLANES ONLY 
F 
IS ALSO KNOWN AS THE 
5 TOTAL ALLOWABLE GAP BETWEEN
TUBE ASSEMBLY. 
THE BEAM HANGER SHAFT/STUD
2 
THE BEAM HANGER IS ALSO 
ASSEMBLY AND THE BEAM HANGER. 
KNOWN AS THE SUPPORT LINK. 
6TOTAL ALLOWABLE GAP BETWEEN
3 
FOR 737-300/-500 
THE STUD ASSEMBLY AND THE
AIRPLANES ONLY 
TUBE ASSEMBLY. 
Main Gear Beam Hanger Shaft Installation 
Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-32-93
 ALL  ú ú 01 Page 403 ú Jul 12/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
737-300/400/500MAINTENANCE MANUAL
 S 014-006
 (5)  
Disconnect the inboard end of the actuator beam (1) from the actuator beam arm (8).
S 024-007
 (6)  
Remove the beam hanger shaft (4).
 (a)  
Hold the actuator assembly and remove the bolts that attach the ends of the beam hanger shaft (4) and stud assembly (18) to the brackets on the structure.
 (b)  
Lower the outboard end of the actuator assembly to get access to the beam hanger shaft (4).
 (c)  
Write the quantity and locations of spacers (16) at the ends of the beam hanger shaft (4) and the stud assembly (18) for use on the installation.
 (d)  
Loosen the stud assembly (18) and remove it from the beam hanger shaft (4).
 (e)  
Remove the beam hanger shaft (4) from the beam hanger (15).
 TASK 32-32-93-404-008
 3.  Main Gear Beam Hanger Shaft Installation (Fig. 401)________________________________________
 A. Consumable Materials
 (1)  
G01395 Compound - Corrosion Inhibiting, BMS 3-27, Mastinox 6856K
 (2)  
D00633 Grease - BMS 3-33
 (3)  
D00013 Grease - MIL-PRF-23827
 (4)  
C00259 Primer - BMS 10-11, Type I (Ref 20-30-41)
 B. 
References
 (1)  
AMM 07-11-11/201, Jack Airplane
 (2)  
AMM 32-32-00/501, Main Gear Extension and Retraction - Adj/Test
 (3)  
AMM 32-32-11/401, Main Gear Actuator Assembly
 C. 
Access
 (1)  
Location Zone
 101,102 Control Cabin
 310,410 Main Landing Gear
 (2)  
Access Panel
 8401,8501 Hydraulic Access Panel
 D. 
Installation
 S 144-009
 (1)  Clean the surfaces of the beam hanger shaft (4), spacers (16), stud assembly (18), and beam hanger (15).
 