• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:51来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 WARNING: MAKE SURE YOU INSTALL THE GROUND LOCK ASSEMBLIES IN THE
_______ LANDING GEAR TO PREVENT THE ACCIDENTAL OPERATION OF THE GEAR. IF THE LANDING GEARS RETRACT, IT CAN CAUSE INJURY TO PERSONS OR DAMAGE TO STRUCTURE.
 (i)  
Pressurize the hydraulic system A.

 (j)  
Use the override trigger to move the landing gear lever from the DN position to the UP position for three times.


 NOTE: Hold the lever in each position for three seconds before
____ you move the landing gear lever to the subsequent position.
 (k)  
Move the landing gear lever to the DN position.

 (l)  
Make sure the rod end of the lock actuator tries to retract when you move the landing gear lever from the DN position to the OFF position.

 (m)  
Move the landing gear lever to the DN position.

 (n)  
Do a check for leakage with the hydraulic pressure applied.

 (o)  
Decrease the pressure from the hydraulic system A (AMM 29-15-00/201).

 (p)  
Make sure there is no leaks in the hydraulic connections.

 (q)  
Examine the hydraulic reservoirs for the correct servicing.

 (r)  
Do a servicing if it is necessary.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-33-21
 ALL  ú ú 02 Page 405 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 NOSE GEAR MODULAR PACKAGE - REMOVAL/INSTALLATION
________________________________________________
 TASK 32-33-31-004-001
 1.  Nose Gear Modular Package Removal (Fig. 401)_________________________________
 A. Equipment
 (1)  
Ground Lock Assemblies (Ref 32-00-01).

 B.
Prepare for the procedure


 S 864-002
 (1)  
Make sure you install the ground lock assemblies for the landing gear (Ref 32-00-01).

 (a)  
Decrease the pressure from the hydraulic system A (Ref 29-15-00, MP).

 C.
Procedure


 S 034-003
 (1)  
Disconnect and seal the hydraulic lines connected to the modular package.

 (a)  
Remove the bolts and washers that hold the modular package. 1) Remove the package from the airplane.

 (b)  
Remove the hydraulic unions.

 (c)  
Discard the O-ring packings.


 NOTE: Seal the ports.
____
 TASK 32-33-31-404-004
 2.  Nose Gear Hydraulic Package Installation (Fig. 401)________________________________________
 A. Consumable Material
 (1)  
G00000 Hydraulic Fluid - BMS 3-11 (Ref 20-30-21)

 B.
Procedure


 S 864-005
 (1)  
Remove the plugs.

 (a)  
Install the hydraulic unions in the hydraulic package with new O-ring packings.

 (b)  
Fill the package with the hydraulic fluid.


 NOTE: Put a cap on the unions.
____
 (c) Put the package in its position on the bracket.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-33-31
 ALL  ú ú 01 Page 401 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

MOUNTING BOLT

Nose Gear Modular Package Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-33-31
 ALL  ú ú 01 Page 402 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (d)  
Install a washer on each mounting bolt.

 (e)  
Put the bolts through the package to the bracket.

 (f)  
Tighten the bolts and hold the package.

 (g)  
Remove the caps and the plugs.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 2(116)