• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:51来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 E.  Remove nose gear ground lock assemblies (Ref 32-00-01).
 F.  Check that nose gear is centered.
 WARNING: PERSONNEL KEEP CLEAR OF GEAR PATHS TO PRECLUDE POSSIBLE INJURY
_______
 TO PERSONNEL.

 CHECK THAT GROUND LOCK ASSEMBLIES ARE INSTALLED IN MAIN LANDING GEAR TO PREVENT INADVERTENT OPERATION OF GEAR. INJURY TO PERSONNEL AND/OR DAMAGE TO EQUIPMENT COULD RESULT IF GEAR RETRACTS.
 CAUTION: DO NOT TURN STEERING WHEEL WITH NOSE GEAR SHOCK STRUT FULLY
_______ EXTENDED TO PREVENT POSSIBLE DAMAGE TO SHOCK STRUT CENTERING CAMS.
 G.  Use override trigger and place landing gear control lever in UP position to retract nose gear, then move control lever to OFF position.
 H.  Depressurize hydraulic system A (Ref 29-15-00, MP) and proceed trouble shooting with pressure off.
 I.  Following trouble shooting, restore airplane to normal.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-35-00
 ALL  ú ú 01 Page 101 ú Jun 25/87
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
3.  Trouble Shooting Charts_______________________

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-35-00
 ALL  ú ú 01 Page 102 ú Jun 25/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 NOSE GEAR MANUAL EXTENSION SYSTEM - ADJUSTMENT/TEST
___________________________________________________
 1.  General_______
 A. This procedure has three tasks:
 (1)  
An adjustment of the manual extension system for the nose gear to get the correct cable tension.

 (2)  
A test of the manual extension system for the nose gear (airplane on jacks).

 (3)  
A test of the manual extension system for the nose gear (airplane on the ground).


 TASK 32-35-00-825-001
 2.  Nose Gear Manual Extension System Adjustment (Fig. 501)____________________________________________
 A. Standard Tools and Equipment
 (1)  Pin - Rigging; 0.311 +0.000/-0.002 inch diameter x 5.00 inches long, Type MS20392-4C
 NOTE: The rigging pin is part of F70207-69 or F70207-78.
____
 B. References
 (1)
20-10-10/401, Clips - Turnbuckle Locking - Removal/Installation

 C.
Access

 (1)  
Location Zone
 101, Control Cabin - Left
 102, Control Cabin - Right
 203, Nose Wheel Well


 D.
Adjustment

 (1)  
Align the rigging pin holes.

 (2)
Install the rigging pin through the torque tube and the bracket.

 (3)  
Remove the cabin floor panel.


 S 825-002
 S 495-010
 S 015-003
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-35-00
 ALL  ú ú 02 Page 501 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL


Nose Gear Manual Extension System
Figure 501 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-35-00
 ALL  ú ú 01 Page 502 ú Feb 20/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

RIGGING PIN HOLE
TORQUE TUBE
RETURN SPRING BRACKET
NOSE GEAR WHEEL WELL AFT BULKHEAD
TORQUE TUBE FWD INBDRIGGING PIN QUADRANT
NOSE GEAR WHEEL WELL RIGHT SIDE BULKHEAD
TORQUE TUBE AND BRACKET ASSEMBLY
B
MANUAL EXTENSION ACCESS DOOR
CABLE MNGEA
CABLE MLGEA (R)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 2(141)