• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:51来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

SHAFT  OD  0.9992  0.9997  0.9985  X 
3  SUPPORT  ID  1.9997  2.0003  2.0010  0.002  X  *[1] 
BEARING  OD  1.9995  2.0000  1.9990  X 
4  SUPPORT  ID  1.9988  1.9993  2.0000  0.001  X  *[2] 
BEARING  OD  1.9995  2.0000  1.9990  X 
5  CRANK  ID  0.005 *[3]  X 
SHAFT  OD  X 
6  CRANK  ID  0.250  0.254  0.261  0.0115  X  *[4] 
BOLT  OD  0.2485  0.2495  0.2475  X 
7  VALVE  ID  0.250  0.254  0.261  0.0115  X  *[4] 
BOLT  OD  0.2485  0.2495  0.2475  X 

*[1]  Install 0.060 wall steel bushing in 2.1212 maximum oversize hole. interference minimum, 0.0013; maximum, 0.0031.  Bushing 
*[2]  Bushing interference minimum, 0.0013; maximum 0.0031. Install NAS75-4 steel bushing or equivalent in 2.0093 maximum oversize hole. 
*[3]  Spline backlash measured at pitch diameter of spline. 
*[4]  Install NAS75-4 steel bushing or equivalent in 0.3754 maximum oversize hole. Bushing interference minimum, 0.0002; maximum, 0.0013. 

Landing Gear Selector Valve Control Quadrant Assembly Wear Limits
Figure 601 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-31-61
 ALL  ú ú 01 Page 604 ú Feb 20/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 LANDING GEAR TRANSFER VALVE - REMOVAL/INSTALLATION
__________________________________________________
 1.  General_______
 A.  This procedure has these tasks:
 (1)
The removal of the transfer valve.

 (2)
The installation of the transfer valve.

 (3)
An operational test of the transfer valve.

 B.  
The transfer valve is installed in the wheel well of the right main gear. It is on the keel beam, near the forward end of the wheel well.


 TASK 32-31-71-024-001
 2.  Landing Gear Transfer Valve Removal (Fig. 401)___________________________________
 A.  References
 (1)
AMM 29-15-00/201, Hydraulic Systems A, B, and Standby

 (2)
AMM 32-00-01/201, Ground Lock Assemblies

 B.  
Access

 (1)  
Location Zones
 101, 102 Control Cabin
 217 Right Main Wheel Well


 C.  
Removal


 (1)  S 494-002Make sure the ground lock assemblies are installed in the nose and main landing gear (AMM 32-00-01/201).
 (2)  S 864-025Open these circuit breakers and attach DO-NOT-CLOSE tags: (a) P6 Circuit Breaker Panel 1) LDG GEAR SYS XFR VALVE - PRIMARY CONTROL 2) LDG GEAR SYS XFR VALVE - SECONDARY CONTROL
 (3)  S 864-026Remove power from hydraulic system A (AMM 29-15-00/201).
 (4)  S 034-027Disconnect the electrical connector from the transfer valve (Fig. 401).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-31-71
 ALL  ú ú 03 Page 401 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
LANDING 
GEAR  LANDING 
RETURN  GEAR 
PRESSURE 
VALVE 
MOUNTING 
MOUNTING BOLT 
(4 LOCATIONS)  B SYSTEM 
PRESSURE 
B SYSTEM 
RETURN 

A SYSTEM 
RETURN 
A SYSTEM 
PRESSURE 
ELECTRICAL 
SOLENOID  CONNECTOR 
SUPPORT BRACKET 

Transfer Valve Installation for the Landing Gear
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-31-71
 ALL  ú ú 02 Page 402 ú Nov 15/97
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 2(59)