EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-32-31
ALL ú ú 01 Page 413 ú Mar 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
C. Installation Test for the Uplock Assembly of the Main Landing Gear
S 584-069
WARNING:_______REMOVE PERSONS AND EQUIPMENT FROM THE LANDING GEAR PATH. WHEN THE LANDING GEARS RETRACT, THEY CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(1) Lift the airplane with the jacks (AMM 07-11-11/201).
S 084-063
WARNING: MAKE SURE THE GROUND LOCK PINS ARE INSTALLED ON ALL THE LANDING
_______ GEARS BUT THE ONE TO BE RETRACTED. WHEN YOU MOVE THE CONTROL LEVER FOR THE LANDING GEAR, THE LANDING GEAR CAN RETRACT AND CAN CAUSE INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT.
(2)
Remove the ground lock pin from the main landing gear to be
retracted (AMM 32-00-01/201).
S 874-064
(3)
Extend and retract the main landing gear several times
(AMM 32-32-00/501).
NOTE: It will bleed the air from the uplock actuator and the lines.
____
(a) Examine for the correct gear operation.
S 794-065
(4)
Examine the hydraulic connections for leaks.
S 944-066
(5)
Extend the main landing gear and install the ground lock pin. To do this, do this task: Ground Lock Assembly Installation (AMM 32-00-01/201).
S 864-067
(6)
For hydraulic system A, do this task: Hydraulic System A or B Power Removal (AMM 29-15-00/201).
(7)
Do this task: Lower the Airplane Off the Jacks (AMM 07-11-11/201).
S 584-068
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-32-31
ALL ú ú 01 Page 414 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 214-070
(8)
Examine the hydraulic reservoirs for the correct servicing, do this task: Hydraulic Systems A, B, and Standby - Inspection/Check (AMM 29-15-00/601).
(a)
Do the servicing if it is necessary.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-32-31
ALL ú ú 03 Page 415 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
MAIN GEAR UPLOCK MECHANISM - INSPECTION/CHECK
_____________________________________________
1. General_______
A. This procedure has illustrations and worn limit charts. No procedure in this section tells you how to get access to do the inspection. Refer to (Main Gear Lock Mechanism - Removal/Installation) for the removal procedures.
TASK 32-32-31-226-001
2. Main Gear Lock Mechanism Wear Limits (Fig. 601)____________________________________
A. General
(1) This procedure has illustrations and worn limit charts. No procedure in this section tells you how to get access to do the inspection. Refer to (Main Gear Lock Mechanism -Removal/Installation) for the removal procedures.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 2(89)