737-300/400/500
MAINTENANCE MANUAL
HYDRAULIC  SEE  A  
PRESSURE  
SWITCH  
AILERON  SEE  C  SEE  B  
ACTUATOR B  
AILERON  
ACTUATOR A 
HYDRAULIC PRESSURE SWITCH 
SEE C ELEVATOR ACTUATOR B 
HYDRAULIC PRESSURE SWITCH 
SEE C 
A/P AILERON ACTUATOR 
A 
HYDRAULIC PRESSURE SWITCH 
SEE C 
ELEVATOR
ELECTRICAL ACTUATOR A
RECEPTICLE HYDRAULIC PRESSUREPORT 
A/P ELEVATOR ACTUATOR
HYDRAULIC PRESSURE SWITCH B
C 
Hydraulic Pressure Switch Installation Figure 401 
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 22-11-40
 ALL  ú ú 01 Page 402 ú Mar 15/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
737-300/400/500MAINTENANCE MANUAL
 (b)  P18 Circuit Breaker Panel 1) AUTO FLT CONT SYS A ENGAGE INTLK A
 S 494-004
 (3)  Get access to the A/P aileron actuators:
 (a)  
Install the downlocks on the main landing gear (Ref 32-00-01/201).
 (b)  
Make sure the screen doors for tire burst protection are open.
 S 014-005
 (4)  Get access to the A/P elevator actuators:
 (a)  Remove the 3802 tail cone access door (Ref 12-31-41/201).
 S 024-006
 (5)  Remove the hydraulic pressure switch:
 (a)  
Disconnect the electrical connector from the hydraulic pressure switch.
 (b)  
Remove the hydraulic pressure switch.
 (c)  
Remove the O-ring and discard it.
 (d)  
Put a cover on the open hydraulic port.
 TASK 22-11-40-404-015
 3.  Hydraulic Pressure Switch Installation (Fig. 401)______________________________________
 A. Consumable Materials
 (1)  
D00148 Fluid - Hydraulic, Fire Resistant, BMS 3-11, Type IV, Class 1
 (2)  
D00054 Lube - Skydrol Assembly, MCS 352
 B. References
 (1)  
12-31-41/201, Body Section 48 Access Doors and Panels
 (2)  
AMM 20-10-44/401, Lockwire
 (3)  
AMM 22-11-40/501, Hydraulic Pressure Switch
 C. Access
 (1)  
Location Zone
 216 Left Main Wheel Well
 705 Tail Cone Access Door
 (2)  
Access Panel
 3802 Tail Cone Access Door
 D. Procedure
 S 864-013
 (1)  
Remove the cover from the hydraulic port.
S 424-008
 (2)  
Install the hydraulic pressure switch:
 (a)  
Lubricate the O-ring with assembly lube or hydraulic fluid.
 (b)  
Lubricate the threads of the hydraulic pressure switch with assembly lube or hydraulic fluid.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 22-11-40
 ALL  ú ú 01 Page 403 ú Nov 15/93 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
737-300/400/500MAINTENANCE MANUAL
 (c)  
Install the O-ring on the hydraulic pressure switch.
 (d)  
Install the hydraulic pressure switch.
 (e)  
Tighten the hydraulic pressure switch from 70 to 120 pound-inches.
 (f)  
Install the lockwire (AMM 20-10-44/401).
 (g)  
Connect the electrical connector to the hydraulic pressure switch.
 E. Hydraulic Pressure Switch Test
 S 864-009
 (1) Close these circuit breakers and remove the DO-NOT-CLOSE tags:
 (a)  
P6 Circuit Breaker Panel
 1) AUTO FLT CONT SYS B ENGAGE INTLK B
 (b)  
P18 Circuit Breaker Panel
 1) AUTO FLT CONT SYS A ENGAGE INTLK A
 S 714-010
 (2)  
Do this task: "Hydraulic Pressure Switch - Adjustment/Test" (Ref 22-11-40/501).
 (3)  
Close the screen doors for the tire burst protection.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 自动飞行 AUTOFLIGHT 2(52)