• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:47来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 22-31-00
 ALL  ú ú 06 Page 506 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
The Current Status test covers all the following subtest groups througha software controlled automatic sequence once the test is initiated.
A/T Test  A/T Computer 
Central Processing Unit 
D/A-A/D Conversions 
429 Wraparounds 
Discretes In/Out 
N1 Card (1 and 2) 
Throttle Hold 
Servo  Actuator 1/2 
Torque Switch 1/2 
Throttle Synchro 1/2 
Engine Configuration 
Analog LRU  Radio Altimeter L 
Flap XMTR L 
Alpha Vane L 
ARINC BUS  MCP 
FMC 
DADC L/R 
IRU L/R 
A/T 

A/T BITE - Current Status Tests
Figure 502

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-31-00
 ALL  ú ú 01 Page 507 ú Jul 15/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (a)  
Set the thrust levers to idle.

 (b)  
Set the flaps to 0 units.

 (c)  
Put the airplane in the ground mode.


 NOTE: You must close these circuit breakers when "SET
____ SQUAT TO ON GND" is shown on the CDU :
 -LANDING GEAR AIR/GND RELAY & LIGHTS (P6-2 panel)
 -AFC AFDS MCP DC (P18-1 panel)
 (d)  
Engage the autothrottle system.

 CAUTION:_______THE THRUST LEVERS WILL MOVE DURING THIS TEST. MAKE SURE ALL PERSONNEL AND EQUIPMENT ARE CLEAR OF THE CABLE AND THE MEC BOX AREA OF THE ENGINE.

 (e)  
Push LSK 6R (CONTINUE>) to go to the TEST IN PROGRESS display.


 NOTE: The A/T will do a self-test for approximately 30
____ seconds. If a failure occurs, the LRU that caused failure will be shown on the CDU after the test.
 (f)  
Monitor the throttle movement during the test.

 (g)  
Make sure the A/T engage switch goes back to OFF at the end of the test automatically.

 (h)  
AIRPLANES WITH A/T COMPUTER P/N 10-62017-21 ONLY; Do these steps shown on the CDU: 1) Set the two throttle levers to their forward stops. 2) Wait for at least 3 seconds 3) Push the LSK 6R (CONTINUE>) 4) Set the two throttle levers to idle 5) Wait for at least 3 seconds 6) Push the LSK 6R (CONTINUE>)


 NOTE: AIRPLANES WITH A/T COMPUTER P/N 10-62017-25 AND
____ SUBSEQUENT; The above steps are not shown on the CDU.
 (i)  Make sure that CDU shows "NO FAULTS".
 S 865-061
 (3)  Put the airplane back to its initial condition.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-31-00
 ALL  ú ú 05 Page 508 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 22-31-00-735-060
 3.  System Test - Autothrottle System_________________________________
 A. General
 (1)  This test gives a complete check of the A/T system and it includes:
 (a)  
A/T BITE Current Status (Operational Test)

 (b)  
A/T BITE Interactive Tests: 1) FMA/ADI or FMA/ADI/EFIS (or FMA/EFIS) tests 2) Input Discretes tests 3) Disengage/Warnings tests 4) Cycle Time Monitor/Power On Reset (CTM/POR) tests 5) AIRPLANES WITH A/T COMPUTER P/N 10-62017-11 AND SUBSEQUENT;

 Throttle Split tests

 (c)  
AIRPLANES WITH A/T COMPUTER P/N 10-62017-11 AND SUBSEQUENT; A/T BITE Engines/Ratings Tests are added

 (d)  
AIRPLANES WITH DUAL FMC;
 Dual FMC Switching Interface Test


 (e)  
Simulated N1 Tach Signal Input Tests


 B. Standard Tools and Equipment
 (1)  
Radio Altimeter (LRRA) Test Set

 -Bendix, AMT-51A
 -Collins 980N-1
 -Honeywell, UG2926AA01
 -TRT, 9599-607-15902

 (2)  
Pitot-Static Test Set

 -ERA 82305
 -Intercontinental Dynamics VPT10C13888-XX
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 自动飞行 AUTOFLIGHT 2(156)