• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:47来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 22-11-26
 ALL  ú ú 03 Page 408 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 AUTOPILOT ELEVATOR ACTUATOR - ADJUSTMENT/TEST
_____________________________________________
 1.  General
_______
 A.  This procedure contains three tasks. The first task and second task are the adjustment of the autopilot elevator actuator. The first task uses the F80217-125 test set for adjustment of the actuator. The second task uses the DFCS BITE test for the adjustment of the actuator (airplanes with -912 and on FCC). You can use one of these tests to adjust the actuator. The third task is the autopilot elevator actuator test.
 TASK 22-11-26-825-001
 2.  Autopilot Elevator Actuator Adjustment (F80217-125 Test Set)
______________________________________
 A.  References
 (1)  
AMM 12-31-41/201, Body Section 48 Access Doors and Panels

 (2)  
AMM 24-22-00/201, Manual Control

 (3)  
AMM 27-31-00/501, Elevator and Tab Control System

 (4)  
AMM 29-15-00/201, Hydraulic A, B, and Standby System


 B.  Access
 (1)  
Location Zone
 704 Tail Cone


 (2)  
Access Panel
 3802 Tail Cone Access Door

 

 C.  Special Tools and Equipment
 (1)  Test Set - Autopilot Elevator/Rudder/Aileron Control Unit - P/N F80217-125
 D.  Standard Tools and Equipment
 (1)  
VTVM - FLUKE (Digital)

 (2)  
Pressure source - Dry air, 0 to 5 psi, with gage, fittings (to connect to the pitot tubes of the feel system)

 (3)  
Ladder or stand - use to measure the elevator position on tail cone


 E.  Autopilot Elevator Actuator Adjustment
 S 865-003
 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 865-078

 (2)  
Make sure that the elevator is rigged properly by doing the following:


 NOTE: The elevator must be correctly rigged before you can adjust
____
 the autopilot elevator actuators.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-11-26
 ALL  ú ú 01 Page 501 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SHAFT QUADRANT OUTPUT  B ACTUATOR AUTOPILOT 
SEE  A  CONTROL ARM ELEVATOR 
A ACTUATOR AUTOPILOT 
A/P ACTUATOR B LEVER ASSEMBLY  SEE ELEVATOR A PCU  B  B PCU SHAFT QUADRANT INPUT ELEVATOR 
ROD ASSEMBLY CONNECTOR ELECTRICAL  FWD  A 
LEVER ASSEMBLY 
HYDRAULIC LINE  9.43 INCHES NOMINAL
A/P ACTUATOR A 
ROD ASSEMBLY  NOMINAL 17.52 INCHES 
TUBE LEVER LOWER TORQUE 

A/P Elevator Actuator Installation Figure 501 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-11-26
 ALL  ú ú 01 Page 502 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (a)  
Set the horizontal stabilizer B dimension to 41.57 |0.01 inch.

 (b)  
With hydraulic power on, make sure that the trailing edge of the elevator is aligned with the index plate mark |0.16 inch above and below the mark. If the elevator is not aligned, make adjustments: "Adjustment - Elevator and Tab Control System" (AMM 27-31-00/501).


 S 865-004
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
_______ SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDER, ELEVATORS, FLAPS, SLATS, SPOILERS, LANDING GEAR, AND THRUST REVERSERS CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (3)  
Supply hydraulic power (AMM 29-15-00/201).

 S 865-006

 (4)  
Open the SHUTOFF VALVE FLT CONT circuit breakers on the P6 Circuit Breaker Panel.

 S 015-007
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 自动飞行 AUTOFLIGHT 2(3)