• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 10:22来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
747-400 MAINTENANCE MANUAL
 SPOILER CONTROL SYSTEM - ADJUSTMENT/TEST
________________________________________
 1.  General
_______
 A.  There are four tasks in this procedure. There is an operational test, an adjustment, a system test and a friction check of the spoiler control system.
 TASK 27-61-00-715-001
 2.  Operational Test - Spoiler Control System (Fig. 501)
_________________________________________
 A.  References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 29-11-00/201, Main Hydraulic Supply System

 (3)  
AMM 32-09-02/201, Air/Ground Relay System

 (4)  
AMM 31-61-00/201, Integrated Display System

 B.  
Access

 (1)  
Location Zone
 221 Control Cabin


 C.  
Thermal Relief Valve Leakage Check


 S 865-191
 (1)  
Do this task: "Spoiler/Speedbrake Deactivation".

 S 985-182

 (2)  
Use hand force only to push up with a load of 30-40 lbs on the trailing edge surface of the spoiler panel. If the surface moves up and continues to move with the load applied, the thermal relief valve is defective.


 NOTE: With a serviceable thermal relief valve it should not be
____
 possible to move the surface up.

 S 965-183
 (3)  
If the outboard flight spoiler thermal relief valve is defective, then do these tasks to replace the valve:

 (a)
"Remove Thermal Relief Valve" (AMM 27-61-05/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-61-00
 ALL  ú ú 01 Page 501 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (b)  "Install Thermal Relief Valve" (AMM 27-61-05/201).
 S 965-189
 (4)  
If the inboard flight spoiler thermal relief valve is defective, then do these tasks to replace the valve:

 (a)  
"Remove Thermal Relief Valve" (AMM 27-61-04/201).

 (b)  
"Install Thermal Relief Valve" (AMM 27-61-04/201).


 S 965-190
 (5)  
If the ground spoiler thermal relief valve is defective, then do these tasks to replace the valve:

 (a)  
"Remove Thermal Relief Valve" (AMM 27-62-05/201).

 (b)  
"Install Thermal Relief Valve" (AMM 27-62-05/201).


 S 715-184
 (6)  
If the thermal relief valve is replaced, do this task: "Operational Test of the Spoiler Control System" (AMM 27-61-00/501).

 D.
Prepare for the Operational Test of the Spoiler Control System


 S 865-002
 (1)  
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).

 S 865-003

 (2)  
Do this task: "Supply Hydraulic Power" (AMM 29-11-00/201).

 S 865-004

 (3)  
Make sure the FLT CONTROL HYD POWER - WING switches on the pilot's overhead panel P5 are in the NORM position.

 S 865-005

 (4)  
Do this task to supply power to the EICAS system: "Airplane System Data Access" (AMM 31-61-00/201).

 E.
Do the Operational Test of the Spoiler Control System


 S 715-006
 (1)  
Do the test of the spoiler control system with the speed brake lever in the DOWN position:

 (a)  
Put the aileron trim in the neutral position.

 (b)  
Put the speed brake lever in the DOWN position.

 (c)  
Turn the aileron control wheel fully clockwise. 1) Make sure the spoilers No. 1 thru 5 are in the fully down


 position. 2) Make sure that spoiler No. 8 is up 20 degrees. 3) Make sure that spoilers No. 9 thru 12 are in the fully up
 position (45 degrees). 4) Make sure the trailing edges of spoilers No. 9 and 10, and No. 11 and 12 align in the limit of 0.50 inch.(12.7mm) 5) Make sure the trailing edges of spoilers spoilers No. 10 and 11 align in the limit of 1.40 inches.(35.6mm) 6) Make sure the left spoiler position indicator on the EICAS status page is at the lower scale mark.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 6(31)