• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 10:22来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a)  
P7, Overhead Circuit Breaker Panel
 1) 7G6, SPEED BRAKE AUTO CONT

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-01
 ALL  ú ú 01 Page 413 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 GROUND SPOILERS - INSPECTION/CHECK
__________________________________
 1.  General_______
 A.  There is one task in this procedure; an inspection of the ground spoilers. To do the inspection, you measure the inner and outer diameters of the parts in the hinges and the control package connection. The parts include bushings, bearings, liners, and bolts.
 B.  To do the check, you must remove the ground spoiler from the airplane and disassemble the hinges and the control package connection. You usually do this procedure before you install a ground spoiler.
 TASK 27-62-01-206-001
 2.  Ground Spoiler Inspection_________________________
 A.  Standard Tools and Equipment
 (1)  
Micrometer - 0 to 1 inch (0-25mm)

 (2)  
Micrometer - 1 to 2 inch (25-50mm)

 (3)  
Vernier Caliper

 B.  
References

 (1)  
27-62-01/401, Ground Spoilers

 C.  
Access

 (1)  
Location Zone
 574 Spoiler No. 6
 674 Spoiler No. 7


 D.  
Procedure


 S 026-002
 (1)
Do this task: "Ground Spoiler Removal" (Ref 27-62-01/401).

 S 226-003

 (2)  
Examine the parts for worn areas:

 (a)  
Remove the parts.

 (b)  
Use a micrometer or a vernier caliper to measure the parts.

 (c)  
Compare the dimensions you measured with the permitted dimensions shown in Fig. 601.

 (d)  
Repair or replace the parts that are not in the tolerance.

 (e)  
Install the parts.

 (3)
Do this task: "Ground Spoiler Installation" (Ref 27-62-01/401).


 S 426-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-01
 ALL  ú ú 01 Page 601 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

SEE A
GROUND SPOILER
ADJUSTABLE
SEAL
SEE B
SEE C
SEE D
SEE B
SEE E
TRAILING EDGE
FWD INBD BEAM
EXAMPLE OF GROUND SPOILERS NO. 6 AND 7 A
Ground Spoiler Wear Limits
Figure 601 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-01
 ALL  ú ú 01 Page 602 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
GROUND SPOILER

INBD
Ground Spoiler Wear Limits
Figure 601 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-62-01
 ALL  ú ú 01 Page 603 ú Jun 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
DESIGN LIMITS WEAR LIMITS
PERMITTED MAXIMUM
DIAMETER
INDEX
WEAR DIAMETER
PART NAME DIM.
NO. MINIMUM MAXIMUM DIMENSION CLEARANCE INCHES INCHES INCHES INCHES (mm) (mm) (mm) (mm)
1
BEARING  ID  0.4993  0.5000  0.5045 
(12.682)  (12.700)  (12.815) 
BOLT  OD  0.4990  0.4995  0.4950 
(12.675)  (12.688)  (12.573) 
BUSHING  ID  0.5000  0.5010  0.5045 
(12.700)  (12.726)  (12.815) 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 6(127)