EFF : ALL
25-43-41Page 421
Config-2 May 01/05
R
CES
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-23-45-000-003 Removal of the Door Frame Linings at the Left AFT
Passenger/Crew Door
25-23-45-400-008 Installation of the Door Frame Linings at the Left
AFT Passenger/Crew Door
25-23-48-000-001 Removal of the Cove Light Panels
25-23-48-400-001 Installation of the Cove Light Panels
25-24-41-000-001 Removal of the Overhead Stowage Compartments
25-24-41-400-001 Installation of the Overhead Stowage Compartments
25-26-41-000-003 Removal of the Aft Curtain Rail
25-26-41-400-003 Installation of the Aft Curtain Rail
25-27-46-400-001 Installation of a Doghouse
25-28-41-000-001 Removal of the Textile Floor-Covering
25-28-41-400-001 Installation of the Textile Floor-Covering
25-28-42-000-001 Removal of the Non-Textile Floor Covering (NTF)
25-28-42-400-001 Installation of the Non-Textile Floor Covering (NTF)
25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65
25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
FR65
26-17-00-710-001 Operational Test of the Lavatory Smoke-Detection
System
33-24-00-710-001 Operational Test of the Lavatory Lighting LQ
33-26-00-710-001 Operational Test of the Lavatory Lighted Signs WJ
35-21-41-000-001 Removal of the Emergency Oxygen Containers
35-21-41-400-001 Installation of the Emergency Oxygen Containers
35-23-00-710-001 Operational Check of Manual Mask Release
38-12-00-710-002 Operational Test of the Potable Water-Distribution
System (with a Ground Air-Supply Cart)
38-12-00-710-004 Operational Test of a Potable Water Heater
38-31-00-710-009 Operational Test of the Toilet Unit
38-31-41-000-001 Removal of a Toilet Assembly
38-31-41-400-001 Installation of a Toilet Assembly
38-32-00-710-002 Operational Test of the Waste/Water Drain System
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25)
25-43-41-991-020 Fig. 401
25-43-41-991-021 Fig. 402
25-43-41-991-015 Fig. 403
25-43-41-991-022 Fig. 404
25-43-41-991-002 Fig. 405
25-43-41-991-023 Fig. 406
25-43-41-991-024 Fig. 407
25-43-41-991-016 Fig. 408
EFF : ALL
25-43-41Page 422
Config-2 May 01/05
R
CES -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R **ON A/C 106-149, 223-299, 301-399, 401-499,
25-43-41-991-025 Fig. 409
**ON A/C ALL
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210, 301-399, 401-499,
Subtask 25-43-41-860-051
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the potable water system is drained (Ref. TASK 12-24-38-680-001).
(3)
Make sure that the WARNING NOTICE is in position to tell persons:
-
not to do the servicing of the potable water system,
-
not to do the servicing of the toilet system.
(4)
Make sure that the curtain and curtain rail is removed (Ref. TASK 25-26-41-000-003).
(5)
Make sure that the overhead stowage compartments are removed (Ref. TASK 25-24-41-000-001).
(6)
Make sure that the cove light panel 251CX is removed (Ref. TASK 25-23-48-000-001).
(7)
Make sure that the upper sidewall panel 251BX is removed (Ref. TASK 25-23-43-000-001).
(8)
Make sure that the lower sidewall panel 251AX is removed (Ref. TASK 25-23-44-000-001).